Permit Details

Status:
Complete
Type:
Development Package
Address:
3637 N 1ST AV
Address NEW:
3637 N 1ST AV
Apply Date:
03/30/2017
Applicant:
Philip Veneziano
Description:
SITE/GRADING - NEW WAREHOUSE BUILDING

Permit Reviews

Permit Number - DP17-0078
Permit Status: Complete
Permit Description: SITE/GRADING - NEW WAREHOUSE BUILDING
Start Date Submittal Complete Date Status  
03/30/2017 DEV PKG - OK TO SUBMIT 03/30/2017 COMPLETED Review Details
03/30/2017 SITE and/or GRADING 05/25/2017 COMPLETED Review Details
05/25/2017 REVISION - SITE 05/25/2017 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP17-0078
Permite Description: SITE/GRADING - NEW WAREHOUSE BUILDING
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/19/2017 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0078
Permit Description: SITE/GRADING - NEW WAREHOUSE BUILDING
Total Completed Inspections - 8
Date Description Inspector Results Comments
05/11/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 05/11/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SWPPP REQUIRED HOWEVER CONTRACTOR MUST ENSURE DISTURBED SOIL FROM THE CONSTRUCTION STAYS ON SITE UNTIL CONSTRUCTION IS COMPLETED.
2) SWEEP UP TRACKED SOIL FROM ADJACENT PUBLIC ROADWAYS.}
05/11/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/11/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS < 1 ACRE THERFORE NO SWPPP IS REQUIRED}
06/05/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/05/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/19/2017 ENGR Grading Final Passed {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/19/2017 SITE - Stormwater Final Inspection Passed {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/19/2017 COT - ENGR - Signage Final Passed {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/26/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/26/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by MMENDIB1 - } ; {Activity date: 06/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING, CALL FOR RE-INSPECTION}
06/26/2017 ENGR Engineering Final Passed {Activity date: 06/26/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by MMENDIB1 - } ; {Activity date: 06/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING, CALL FOR RE-INSPECTION}