Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP17-0078
Permit Details
Apply Date:
03/30/2017
Applicant:
Philip Veneziano
Description:
SITE/GRADING - NEW WAREHOUSE BUILDING
Permit Reviews
Permit Number - DP17-0078
Permit Status: Complete
Permit Description: SITE/GRADING - NEW WAREHOUSE BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/30/2017 | DEV PKG - OK TO SUBMIT | 03/30/2017 | COMPLETED |
| 03/30/2017 | SITE and/or GRADING | 05/25/2017 | COMPLETED |
| 05/25/2017 | REVISION - SITE | 05/25/2017 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP17-0078
Permite Description: SITE/GRADING - NEW WAREHOUSE BUILDING
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/19/2017 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0078
Permit Description: SITE/GRADING - NEW WAREHOUSE BUILDING
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/11/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SWPPP REQUIRED HOWEVER CONTRACTOR MUST ENSURE DISTURBED SOIL FROM THE CONSTRUCTION STAYS ON SITE UNTIL CONSTRUCTION IS COMPLETED. 2) SWEEP UP TRACKED SOIL FROM ADJACENT PUBLIC ROADWAYS.} |
|
| 05/11/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/11/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS < 1 ACRE THERFORE NO SWPPP IS REQUIRED} | |
| 06/05/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/05/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/19/2017 | ENGR Grading Final | Passed | {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/19/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/19/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 06/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/26/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/26/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by MMENDIB1 - } ; {Activity date: 06/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING, CALL FOR RE-INSPECTION} | |
| 06/26/2017 | ENGR Engineering Final | Passed | {Activity date: 06/26/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by MMENDIB1 - } ; {Activity date: 06/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING, CALL FOR RE-INSPECTION} |