Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1515 W ONTARIO ST
Apply Date:
02/08/2017
Applicant:
Description:
SITE

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0034
Permit Description: SITE
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/06/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/06/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED. HOWEVER THE CONTRACTOR MUST KEEP SOIL ON THE SITE DURING CONSTRUCTION.
2) CALL FOR INSPECTION FOR ANY RE-BAR LAYOUT OR UNDERGROUND SITE WORK
3) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS OR QUESTIONS
4) AN APPROVED SET OF PLANS SHOULD BE ON SITE DUURING CONSTRUCTION}
03/20/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/20/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/20/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/20/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/20/2018 SITE - Stormwater Follow-up Passed {Activity date: 03/20/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/17/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
03/20/2018 SITE - Stormwater Final Inspection Passed {Activity date: 03/20/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/20/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 03/20/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/20/2018 COT - ENGR - Signage Final Passed {Activity date: 03/20/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/27/2018 ENGR Engineering Final Passed {Activity date: 03/27/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/20/2018; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL HC SIGN FOR HC PARKING IN FRONT OF HC PARKING SPACE. ENSURE SIGN IF 7' TO THE BOTTOM OF SIGN
2) INSTALL BIKE PARKING SHOWN ON APPROVED PLANS
3) INSTALL TYPE II SIDEWALK SCUPPERS SHOWN ON APPROVED PLAN - OR REVISE THE PLAN TO SHOW WHAT WAS INSTALLED

CALL FOR RE-INSPECTION}
04/08/2021 ENGR Grading Final Passed {Activity date: 04/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Note, inspector recommends closing this expired permit as all inspections were approved.} ; {Activity date: 03/23/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Note inspector recommends closing expired permit as all inspections were approved} ; {Activity date: 03/20/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/03/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET THE CREW ON SITE, THEY HAVE BEEN WORKING FOR THIS PAST 2 DAYS. I HAVE ADVISAED THEM TO SCHEDULE FOR THE SITE PRE-CONSTRUCTION MEETING BY FRIDAY, OR WE MAY HAVE TO ISSUE THEM A STOP WORK ORDER FOR NON-COMPLIANCE.}

Documents

File Name Document Type  
001_COVER SHEET_C1.TIF DEVELOPMENT PACKAGE VIEW
002_DEVELOPMENT_C2.TIF DEVELOPMENT PACKAGE VIEW
003_UTILITY_C3.TIF DEVELOPMENT PACKAGE VIEW
004_LANDSCAPE_L2.TIF DEVELOPMENT PACKAGE VIEW
005_IRRIGATION_L3.TIF DEVELOPMENT PACKAGE VIEW
006_LANDSCAPE DETAILS_L4.TIF DEVELOPMENT PACKAGE VIEW
007_IRRIGATION DETAILS_L5.TIF DEVELOPMENT PACKAGE VIEW
008_IRRIGATION DETAILS_L6.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW