Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
01/18/2017
Applicant:
Description:
GRADING

Permit Reviews

Permit Number - DP17-0017
Permit Status: Complete
Permit Description: GRADING
Start Date Submittal Complete Date Status  
01/10/2018 GRADING 01/26/2018 COMPLETED Review Details
01/18/2017 DEV PKG - OK TO SUBMIT (GRADING ONLY) 01/25/2017 COMPLETED Review Details
02/08/2017 GRADING 03/14/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0017
Permit Description: GRADING
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/20/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/20/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/21/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/21/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/21/2019 SITE - Stormwater Follow-up Passed {Activity date: 05/21/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/21/2019 ENGR Grading Final Passed {Activity date: 05/21/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/21/2019 SITE - Stormwater Final Inspection Passed {Activity date: 05/21/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/21/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 05/21/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/21/2019 COT - ENGR - Signage Final Passed {Activity date: 05/21/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/08/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/21/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK ON THIS SITE PER THE APPROVED PLAN. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING ITEMS 1) THE DRAINAGE SWALE ALONG THE TOP OF THE SLOPE ON THE UPPER PERIMETER OF THE HOUSE HAS BEEN INSTALLED, BUT WAS INSTALLED WITHOUT THE UTILIZATION OF FILTER FABRIC AS SHOWN IN THE DETAIL. INSTALL THE MIRAFI FILTER FABRIC PRIOR TO CALLING IN THE FINAL INSPECTION. 2) MAKE SURE THAT ALL DISTURBED SOIL AREAS HAVE DECOMPOSED GRANITE OR HYDROSEED PLACED ON THEM PRIOR TO CALLING FOR THE FINAL INSPECTION.}
05/04/2021 ENGR Engineering Final Passed {Activity date: 05/04/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/23/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE OWNER OF THE SITE HAS BEEN ADVISED TO MAKE THE NECESSARY CHANGES TO THE APPROVED NOTING THAT MARAFI FILER FABRIC DID NOT NEED TO BE INSTALLED. I HAVE ALSO ADVISED LOREN MAKUS THAT THIS PLAN IS COMING IN FOR A MINOR REVISION, HE IS OKAY WITH THE CHANGES THAT WE ARE REQUESTING.} ; {Activity date: 08/08/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - FINAL NOT TO BE GIVEN TILL THE PLANS HAVE BEEN REVISED REMOVING THE REQUIREMENT OF ALL ROCK RIP RAP IS TOO HAVE FILTER FABRIC INSTALLED BENEATH IT.} ; {Activity date: 05/21/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK ON THIS SITE PER THE APPROVED PLAN. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING ITEMS 1) THE DRAINAGE SWALE ALONG THE TOP OF THE SLOPE ON THE UPPER PERIMETER OF THE HOUSE HAS BEEN INSTALLED, BUT WAS INSTALLED WITHOUT THE UTILIZATION OF FILTER FABRIC AS SHOWN IN THE DETAIL. INSTALL THE MIRAFI FILTER FABRIC PRIOR TO CALLING IN THE FINAL INSPECTION. 2) MAKE SURE THAT ALL DISTURBED SOIL AREAS HAVE DECOMPOSED GRANITE OR HYDROSEED PLACED ON THEM PRIOR TO CALLING FOR THE FINAL INSPECTION.3) INSTALL THEDRIVEWAY, BRICK PAVERS, AND SIDEWALK AS NEEDED THROUGHOUT THE SITE PER THE APPROVED PLANS. ENSURE THAT ALL SIDEWALKS ARE ADA COMPLIANT. 4) COMPLETE ALL LANDSCAPING THROUGHOUT THIS SITE PER THE APPROVED PLANS. I RAISED QUESTIONS ONSITE DURING THIS INSPECTION ABOUT SLOPE TREATMENTS BEING LESS THAN 2 TO 1 SLOPE VALUES, USING ROCK RIP RAP WITHOUT CONCRETE OR FILTER. YOU AND I WILL VERIFY WITH LOREN MAKUS WHAT IS THE REQUIRED SLOPE TREATMENT PRIO TO THE NEXT INSPECTION. 5) GENERAL SITE CLEANUP PRIOR TO THE FINAL APPROVAL OF THIS DEVELOPMENT PACKAGE. 6) PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD AND APPROVED REVISED DRAWINGS TO BE UTILIZED DURING THE FINAL INSPECTION OF THIS SITE.}

Documents

File Name Document Type  
001_SITE _A-010.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW