Permit: DP16-0181
Permit Details
Status:
Complete
Type:
Development Package
Address:
2484 N WYCHWOOD CT
Address NEW:
2484 N WYCHWOOD CT
Apply Date:
10/19/2016
Applicant:
Christi Swenson
Description:
GRADING
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0181
Permit Description: GRADING
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/26/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 10/26/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/26/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/24/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE SWPPP CONTOLS.} | |
| 04/03/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/03/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/03/2017 | ENGR Engineering Final | Passed | {Activity date: 04/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/29/2017; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO ONE ON SITE AT THIS TIME, NO PLANS PROVIDED FOR THE GRADING. PROVIDE APPROVED PLANS FOR THIS SITE WHEN THIS INSPECTION IS RECALLED IN.} | |
| 04/03/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/02/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 04/03/2017 | ENGR Grading Final | Passed | {Activity date: 04/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/03/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/03/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 04/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |