Permit: DP16-0180
Permit Details
Status:
Issued
Type:
Development Package
Address:
3102 E FAIRMOUNT ST
Address NEW:
3102 E FAIRMOUNT ST
Apply Date:
10/19/2016
Applicant:
Description:
SITE/GRADING - FAIRMOUNT ST. SENIOR HOUSING
Permit Reviews
Permit Number - DP16-0180
Permit Status: Issued
Permit Description: SITE/GRADING - FAIRMOUNT ST. SENIOR HOUSING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/16/2017 | DEV PKG - RESUBMITTAL | 06/26/2017 | COMPLETED |
| 09/10/2018 | REVISION - SITE | 09/10/2018 | COMPLETED |
| 10/19/2016 | DEV PKG - OK TO SUBMIT | 10/24/2016 | COMPLETED |
| 10/24/2016 | SITE and/or GRADING | 11/25/2016 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP16-0180
Permite Description: SITE/GRADING - FAIRMOUNT ST. SENIOR HOUSING
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP16-0180
Permit Description: SITE/GRADING - FAIRMOUNT ST. SENIOR HOUSING
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/21/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 2) CALL FOR FOLLOW UP INSPECTION FOR ANY UNDERGROUND STORM WORK OR RE-BAR INSTALL 3) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS 4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE} |
|
| 07/21/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/21/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 2) CALL FOR FOLLOW UP INSPECTION FOR ANY UNDERGROUND STORM WORK OR RE-BAR INSTALL 3) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS 4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE} |
|
| 07/13/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 07/13/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE NOT READY AT THIS TIME FOR THIS INSPECTION, THESE WILL BE RESCHEDULED AT A LATER DATE WHEN THE SITE IS ALMOST COMPLETE} | |
| 07/13/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 07/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 07/16/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 07/16/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/13/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/16/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} |