Permit: DP16-0171
Permit Details
Status:
Complete
Type:
Development Package
Address:
3236 N FREEWAY INDUSTRIAL LP
Address NEW:
3236 N FREEWAY INDUSTRIAL LP
Apply Date:
09/28/2016
Applicant:
Description:
SITE
Permit Reviews
Permit Number - DP16-0171
Permit Status: Complete
Permit Description: SITE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2017 | RESUB - SITE and/or GRADING | 01/05/2017 | COMPLETED |
| 09/28/2016 | SITE and/or GRADING | 09/29/2016 | COMPLETED |
| 09/29/2016 | SITE and/or GRADING | 10/31/2016 | COMPLETED |
| 12/28/2016 | SITE and/or GRADING | 01/05/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0171
Permit Description: SITE
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 08/24/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 08/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 10/09/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/24/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSTALL LANDSCAPING PER APPROVED LANDSCAPE PLAN} | |
| 10/09/2017 | ENGR Engineering Final | Passed | {Activity date: 10/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/24/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) DUE TO THE FACT THAT NO SITE/GRADING/LANDSCAPING OR STORM WATER INSPECTIONS WERE CALLED IN DURING CONSTRUCTION - PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT SITE/GRADING WAS IN CONFORMANCE WITH THE APPROVED GRADING PLAN. 2) PROVIDE SHORT TERM BIKE PARKING PER PLAN. 3) PROVIDE EXTRUDED CURB PER NOTE#24, PAGE C1.0 4) PROVIDE PARKING BUMPERS PER NOTE#28, PG C1.0 5) PROVIDE LOADING ZONE PER NOTE#21, PG C1.0 6) PROVIDE LONG TERM BIKE PARKING PER NOTE#37, PG C1.0 7) PROVIDE SET BACK FOR PARKING ALONG NORTH WALL PER NOTE#4, PG C1.0 8) APPROVED PLANS DO NOT SHOW A VALLEY GUTTER, BUT SHOW A DETAIL FOR ONE.} |
|
| 10/09/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 10/09/2017 | ENGR Grading Final | Passed | {Activity date: 10/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 10/09/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 10/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 10/09/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 10/09/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/09/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/24/2017; Status: Not Applicable; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO INSPECTIONS CALLED IN} |