Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3560 N CRAYCROFT RD
Apply Date:
08/19/2016
Applicant:
Marty Magelli
Description:
SITE/GRADING - Blake's Tucson Store #93Originally approved 10/24/2016 (10 pages)1st Revision a

Permit Reviews

Permit Number - DP16-0147
Permit Status: Complete
Permit Description: SITE/GRADING - Blake's Tucson Store #93Originally approved 10/24/2016 (10 pages)1st Revision a
Start Date Submittal Complete Date Status  
02/22/2017 DEV PKG - REVISION 11/28/2017 COMPLETED Review Details
08/19/2016 DEV PKG - OK TO SUBMIT 09/13/2016 COMPLETED Review Details
09/13/2016 DEV PKG 10/12/2016 COMPLETED Review Details
10/19/2016 DEV PKG - RESUBMITTAL 01/09/2017 COMPLETED Review Details
11/29/2017 DEV PKG - REVISION 11/30/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0147
Permit Description: SITE/GRADING - Blake's Tucson Store #93Originally approved 10/24/2016 (10 pages)1st Revision a
Total Completed Inspections - 10
Date Description Inspector Results Comments
04/19/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/19/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 -
MARK 309-9502 (CANYON)

1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED, HOWEVER THE CONTRACTOR MUST KEEP DISTURBED SOIL ON THE SITE DURING CONSTRUCTION.
2) CALL FOR INSPECTION FOR ANY SITE, GRADING, OR LANDSCAPING CONCERNS OR QUESTIONS
3) COMMUNICATE ANY CHANGES MADE TO THE APPROVED PLANS}
11/03/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/03/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 11/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/03/2017 COT - ENGR - Signage Final Passed {Activity date: 11/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/04/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/04/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/03/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET KAREN NOVAK ON SITE SHE WILL MAKE SURE THAT ALL OF THE WORK IS DONE PER THE APPROVED PLANS OR SHE WILL SUBMIT REVISED DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE TO THIS SITE AND HAVE THEM APPROVED PRIOR TO CALLING IN FOR THE FINAL LANDSCAPING INSPECTION.} ; {Activity date: 07/18/2017; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE NOT READY AT THIS TIME, CONTRACTOR TRIED TO SCHEDULE CHECK FOR GRADING ACTIVITY BUT IT WOULD NOT ALLOW IT TO BE SCHEDULED.
SITE VISIT ONLY AT THIS TIME.
NO STORMWATER CONCERNS, HAVE ADVISED TO ADJUST THE WADDLE AT THE NORTHWEST OUTLET WHERE IT HAS BEEN LIFTED AND IS ALLOWING MINOR SAND TO ESCAPE.
SUPERVISOR WILL RESCHEDULE THE INTERMEDIATE GRADING O R THE STORMWATER FOLLOW-UP FOR FUTURE INSPECTIONS.}
01/04/2018 SITE - SWPPP Correction Notice Passed {Activity date: 01/04/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/18/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO STORMWATER CONCERNS, HAVE ADVISED TO ADJUST THE WADDLE AT THE NORTHWEST OUTLET WHERE IT HAS BEEN LIFTED AND IS ALLOWING MINOR SAND TO ESCAPE.}
01/04/2018 SITE - Stormwater Follow-up Passed {Activity date: 01/04/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/03/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, ADJACENT STREETS LOOK TO BE IN GOOD SHAPE.} ; {Activity date: 10/18/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/14/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SOME CLEAN UP MADE FROM LAST INSPECTION.} ; {Activity date: 08/09/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH SUPERINTENDENT ABOUT PROVIDING A WASH OUT AND REPAIRING SWPPP CONTROLS.} ; {Activity date: 07/28/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 07/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO STORMWATER CONCERNS, HAVE ADVISED TO ADJUST THE WADDLE AT THE NORTHWEST OUTLET WHERE IT HAS BEEN LIFTED AND IS ALLOWING MINOR SAND TO ESCAPE.} ; {Activity date: 07/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.}
01/04/2018 ENGR Grading Final Passed {Activity date: 01/04/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2018 SITE - Stormwater Final Inspection Passed {Activity date: 01/04/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/07/2017; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY AT THIS TIME, WORK CONTINUES. RESCHEDULE THIS INSPECTION ONCE THE SITE IS COMPLETE AND YOU HAVE FILED FOR THE NOT}
01/12/2018 ENGR Engineering Final Passed {Activity date: 01/12/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/04/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NOTES ON ENGINEERING.}