Permit Details

Status:
Complete
Type:
Development Package
Address:
25 W LEE ST
Apply Date:
08/19/2016
Applicant:
Description:
NEW PARKINGOriginally approved 10/11/2016 (7 pages)

Permit Reviews

Permit Number - DP16-0146
Permit Status: Complete
Permit Description: NEW PARKINGOriginally approved 10/11/2016 (7 pages)
Start Date Submittal Complete Date Status  
08/19/2016 SITE and/or GRADING 09/01/2016 COMPLETED Review Details
09/01/2016 DEV PKG 10/05/2016 COMPLETED Review Details
10/05/2016 DEV PKG 10/31/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0146
Permit Description: NEW PARKINGOriginally approved 10/11/2016 (7 pages)
Total Completed Inspections - 10
Date Description Inspector Results Comments
11/29/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/29/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/29/2016 SITE - Stormwater Follow-up Passed {Activity date: 11/29/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/29/2016 SITE - Stormwater Final Inspection Passed {Activity date: 11/29/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/29/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 11/29/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/29/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/29/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTRACTOR IS WORKING ON THE CUTTING OF GRADE FOR THE WALL FOOTERS ON THIS SITE. I HAVE ADVISED HIM THAT HE WILL NEED TO MAKE SURE THAT NONE OF THE SITE MATERIALS LEAVES THIS SITE SINCE IT HAS NO STORMWATER REQUIREMENTS. THE EXISTING DDRIVEWAYS MAY NEED TO BE CLOSED IF NOT BEING UTILIZED.}
11/29/2016 COT - ENGR - Signage Final Passed {Activity date: 11/29/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/10/2017 ENGR Grading Final Passed {Activity date: 01/10/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
01/23/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/10/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR INSPECTION}
01/23/2017 ENGR Engineering Final Passed {Activity date: 01/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/10/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL SITE WORK SHOWN ON THE APPROVED PLAN}
06/28/2017 RSBU - Building Final Passed {Activity date: 06/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_DP-1.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_DP-2.TIF DEVELOPMENT PACKAGE VIEW
003_OVERALL SITE REFERENCE_DP-3.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / PAVING_C-1.TIF DEVELOPMENT PACKAGE VIEW
005_LANDSCAPE / IRRIGATION_L-1.TIF DEVELOPMENT PACKAGE VIEW
006_WATER HARVESTIING_L-2.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILS / NOTES_L-3.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW