Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
08/17/2016
Applicant:
Description:
SITE/GRADING/SWPPP - TRACTOR SUPPLY COMPANY TUCSON SOUTH1st revision approved 04/18/2017 (sheet

Permit Reviews

Permit Number - DP16-0142
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TRACTOR SUPPLY COMPANY TUCSON SOUTH1st revision approved 04/18/2017 (sheet
Start Date Submittal Complete Date Status  
04/17/2017 DEV PKG - REVISION 04/18/2017 COMPLETED Review Details
08/17/2016 DEV PKG - OK TO SUBMIT 08/17/2016 COMPLETED Review Details
08/19/2016 DEV PKG 09/21/2016 COMPLETED Review Details
10/31/2016 DEV PKG 12/02/2016 COMPLETED Review Details
12/13/2016 DEV PKG - RESUBMITTAL 02/13/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0142
Permit Description: SITE/GRADING/SWPPP - TRACTOR SUPPLY COMPANY TUCSON SOUTH1st revision approved 04/18/2017 (sheet
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/07/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 03/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - ADD TRACK OUT ROCK .UPDATE SWPPP PLANS. PROVIDE SWPPP SIGN AT GATE.}
03/21/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/21/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/07/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/07/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/07/2017 SITE - Stormwater Follow-up Passed {Activity date: 07/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/26/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - NO CONCERNS .} ; {Activity date: 04/20/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR TRACKOUT NOTED ALONG THE SOUTHSIDE OF THE SITE, I WILL RECHECK THIS SITE TOMORROW TO VERIFY IT IS CLEANED UP PRIOR THE WEEKEND.} ; {Activity date: 04/20/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGH OUT CONSTRUCTION} ; {Activity date: 03/23/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED AT THE SITE AND HAVE ADVISED THAT THEY NEEDED TO LOOK AT THE FOLLOWING 2 ITEMS 1) REPAIR THE SILT FENCE AS NEEDED WHERE IT IS NEEDED, THIS INCLUDES BURYING AREAS THAT ARE EXPOSED AND STAPLING THE FENCE BACK TO THE STAKES. 2) THE CONCRETE WASHOUT IS WORKING AT THIS TIME BUT NEEDS TO EITHER BE LINED WITH PLASTIC, OR PROVIDE APPROVED STORAGE BINS THAT WILL NE TO BE CLEANED ON A REGULAR BASIS.}
07/07/2017 SITE - Stormwater Final Inspection Passed {Activity date: 07/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/07/2017 COT - ENGR - Signage Final Passed {Activity date: 07/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/25/2017 ENGR Grading Final Passed {Activity date: 07/25/2017; Status: Approved; Inspector: RLEDON; Comment: Entered by KROBLES1 - }
07/26/2017 ENGR Engineering Final Passed {Activity date: 07/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PER STEVE SHIELDS THE SIDEWALK ON WEST SIDE OF SITE MEETS THE INTENTOF THE CODE. PER EMAIL 7/25/2017.} ; {Activity date: 07/25/2017; Status: Approved; Inspector: RLEDON; Comment: Entered by KROBLES1 - } ; {Activity date: 07/24/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL NOTES FROM PAST INSPECTIONS.} ; {Activity date: 07/19/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE HAS BEEN CHECKED FOR FINAL GRADING BUT IS NOT READY AT THIS TIME. ADDITIONAL WORK WILL BE REQUIRED PRIOR TO APPROVING THIS PERMIT. ADDITIONAL COMMENTS MAY BE REQUIRED IF ANY OF THE ON GOING WORK DAMAGES ANY ITEMS THAT ARE GOOD AT THIS TIME. FOLLOWING IS A LIST OF THE INDIFFICIENCIES THAT HAVE BEEN NOTED ON THIS DATE:
1) GENERAL CLEAN-UP OF THE SITE FOR THE REMOVAL OF ALL EXCESS CONSTRUCTION MATERIALS, TRASH AND DEBRIS. MINOR AMOUNTS HAVE BEEN NOTED IN THE AREAS OF OPEN PADS, DRAINAGEWAYS, AND IN AND AROUND THE BASIN.
2) REPLACE ANY DAMAGED IRRIGATION MATERIALS THAT HAS BEEN INSTALLED UNDER THIS PERMIT. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE IRRIGATION LINES AND SERVICE BOXES FOR THE CONTROLERS, AND VALVES.
3) INSTALL ALL TREES PER THE APPROVED PLANS AND ENSURE THAT ALL ARE VIABLE AND THE TIME OF THE NEXT SCHEDULED INSPECTION.
4) ONE OF THE MANHOLES IN THE BASIN IS SHOWING SIGNS OF SETTLEMENT AROUND THE WESTERN SIDE. THIS MAY BE AN INDICATION THAT THE MANHOLE IS NOT SEALED CORRECTLY BETWEEN THE RINGS OR THAT THERE IS SOME OTHER DAMAGE THAT IS ALLOWING THE FINE SOIL TO WASH EITHER INTO THE SYSTEM OR IS WASHING INTO THE BACKFILL MATERIAL.
5) THE TRASH ENCLOSURE GATES HAVE NOT BEEN COMPLETED PER THE APPROVED PLANS. THE FRAME WORK FOR THE GATES HAS BEEN INSTALLED BUT THE STEEL PANELS HAS NOT BEEN INSTALLED AND WELDED ONTO THE FRAMES.
6) PROVIDE AN ACCESSIBLE ROUTE TO THE SITE FROM AND ADJACENT STREET, THIS CAN BE INDIAN AGENCY ROAD, OR VALENCIA ROAD. ADDITIONAL SIDEWALK OR RAMPS MAY BE REQUIRED, CONTACT STEVE SHIELDS THE ZONING REVIEWER AT 201 N. STONE TO VERIFY WHAT IS NEEDED FOR THIS ITEM.} ; {Activity date: 07/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE INSPECTION WILL BE CHECKED TOMORROW ONCE PLANS ARE AVAILABLE AND THERE IS MORE TIME TO PERFORM THE INSPECTION. I ADVISED NATHAN (270) 777-6366 THAT I WILL RETURN TOMORROW AND PERFORM THE REMAINING INSPECTIONS WITH THE APPROVED PLANS. AT THIS TIME HE WILL BE SEEKING A TCO FOR STOCKING ONLY.} ; {Activity date: 07/07/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC WENT OVER WORK TO COMPLET FOR FINAL AND TO PROVIDE AS-BUILTS AND CERT LETTER FOR ALL GRADING AND DRAINAGE FROM ENGINEER OF RECORD FOR FINAL.}

Documents

File Name Document Type  
001_COVER SHEET_C1.01.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_C1.02.TIF DEVELOPMENT PACKAGE VIEW
003_GRADING_C1.03.TIF DEVELOPMENT PACKAGE VIEW
004_PAVING / UTILITIES / UNDERGROUND DRAINAGE_C1.04.TIF DEVELOPMENT PACKAGE VIEW
005_DETAILS_C1.05.TIF DEVELOPMENT PACKAGE VIEW
006_SECTIONS_C1.06.TIF DEVELOPMENT PACKAGE VIEW
007_COVER SWPPP_C3.01.TIF DEVELOPMENT PACKAGE VIEW
008_SWPPP_C3.02.TIF DEVELOPMENT PACKAGE VIEW
009_COLORED BUILDING ELEVATIONS_A1.TIF DEVELOPMENT PACKAGE VIEW
010_SALVAGE_L1.TIF DEVELOPMENT PACKAGE VIEW
011_RAINWATER HARVESTING_L2.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE_L3.TIF DEVELOPMENT PACKAGE VIEW
013_IRRIGATION_L4.TIF DEVELOPMENT PACKAGE VIEW
014_PLANTING DETAILS_L5.TIF DEVELOPMENT PACKAGE VIEW
015_IRRIGATION DETAILS_L6.TIF DEVELOPMENT PACKAGE VIEW
016_PLANTING SPECIFICATIONS_L7.TIF DEVELOPMENT PACKAGE VIEW
017_IRRIGATION SPECIFICATIONS_L8.TIF DEVELOPMENT PACKAGE VIEW
TEP FACILITIES MAP DP16-0142.PDF DOCUMENTS VIEW
1_GEOTECH REPORT.PDF DOCUMENTS VIEW
1_SIGNED DRAINAGE REPORT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
001_CR-1.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW