Permit: DP16-0135
Permit Details
Status:
Complete
Type:
Development Package
Address:
9230 S HOUGHTON RD
Address NEW:
9230 S HOUGHTON RD
Apply Date:
08/11/2016
Applicant:
Lisa Bowers
Description:
POPEYE'S- SITE/GRADING
Permit Reviews
Permit Number - DP16-0135
Permit Status: Complete
Permit Description: POPEYE'S- SITE/GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2017 | RESUB - SITE/GRADING ALL | 06/01/2017 | COMPLETED |
| 06/01/2017 | REVISION - SITE | 06/07/2017 | COMPLETED |
| 08/11/2016 | DEV PKG - OK TO SUBMIT | 08/23/2016 | COMPLETED |
| 08/23/2016 | SITE and/or GRADING | 11/09/2016 | COMPLETED |
| 11/09/2016 | RESUB - SITE/GRADING ALL | 01/13/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0135
Permit Description: POPEYE'S- SITE/GRADING
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/31/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 05/31/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/31/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED. 2) CALL FOR INSPECTION FOR RE-BAR LAY OUT AND FOOTINGS FOR TRASH ENCLOSURE. 3) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS} |
|
| 09/05/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/05/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 09/05/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 09/05/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 09/13/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 09/13/2017 | ENGR Engineering Final | Passed | {Activity date: 09/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/12/2017; Status: Partial Approval; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) COMPLETE OVERHEAD WORK 2) COMPLETE CONCRETE AROUND CLEAN OUTS} ; {Activity date: 09/11/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |
|
| 09/13/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/13/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO APPARENT ISSUES AT THIS TIME DINCE THE LAST RAINS, ALL CONTROLS APPEAR TO BE WORKING.} | |
| 09/13/2017 | ENGR Grading Final | Passed | {Activity date: 09/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 09/13/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ} |