Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
3159 W SALVIA DR
Address NEW:
3159 W SALVIA DR
Apply Date:
08/05/2016
Applicant:
Luong Nguyen
Description:
GRADING

Permit Reviews

Permit Number - DP16-0132
Permit Status: Complete
Permit Description: GRADING
Start Date Submittal Complete Date Status  
02/03/2017 GRADING 02/03/2017 ACTIVE Review Details
08/05/2016 DEV PKG - OK TO SUBMIT (GRADING ONLY) 08/05/2016 COMPLETED Review Details
08/12/2016 GRADING 09/13/2016 COMPLETED Review Details
09/20/2016 RESUB - SITE and/or GRADING 10/27/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0132
Permit Description: GRADING
Total Completed Inspections - 9
Date Description Inspector Results Comments
11/01/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/01/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SITE IS LESS THAN 1 ACRE THEREFORE A STORM WATER PERMIT IS NOT REQUIRED. HOWEVER DUE TO THE FACT THAT THE SITE IS ON A HILL AND NEXT TO A WASH, SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE DOWNSLOPE SIDE OF THE SITE.
2) WADDLE (SILT SOCK) HAS BEEN INSTALLED - OK
3) RECOMMEND ADDITIONAL SILT SOCK SHOULD BE ADDED ALONG THE SOUTH END.
4) EXISTING BLDG PAD, NO CIVIL PLANS AVAILABLE.
5) CALL FOR RE-INSPECTION FOR ANY QUESTIONS AND/OR CONCERNS}
02/27/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/27/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/27/2017 ENGR Engineering Final Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/27/2017 SITE - Stormwater Follow-up Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/27/2017 ENGR Grading Final Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/27/2017 SITE - Stormwater Final Inspection Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/27/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/27/2017 COT - ENGR - Signage Final Passed {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_SITE_A1.TIF DEVELOPMENT PACKAGE VIEW
001_COVER SHEET_C1.TIF DEVELOPMENT PACKAGE VIEW
002_NPPP_L2.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW