Permit Details

Status:
Complete
Type:
Development Package
Address:
3710 N ORACLE RD
Address NEW:
3710 N ORACLE RD
Apply Date:
07/28/2016
Applicant:
Description:
SITE

Permit Reviews

Permit Number - DP16-0127
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
02/08/2017 DEV PKG - REVISION 02/08/2017 ACTIVE Review Details
07/28/2016 SITE and/or GRADING 09/09/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0127
Permit Description: SITE
Total Completed Inspections - 8
Date Description Inspector Results Comments
09/22/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/22/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SITE IS LESS THAN 1 ACRE, THEREFORE A STORM WATER PERMIT/PLAN IS NOT REQUIRED.
2) ENSURE SITE IS CONSTRUCTED PER THE APPROVED PLANS
3) ENSURE HC PARKING AND ACCESS MEET ADA REQUIREMENTS
4) ENSURE LANDSCAPING IS COMPLETED PER PLAN
5) CALL FOR INSPECTION FOR ANY SITE CHANGES AND/OR CONCERNS}
02/02/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/02/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/02/2017 SITE - Stormwater Follow-up Passed {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/10/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CONCERNS AT THIS TIME}
02/02/2017 ENGR Grading Final Passed {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/02/2017 SITE - Stormwater Final Inspection Passed {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/02/2017 COT - ENGR - Signage Final Passed {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/13/2017 ENGR Engineering Final Passed {Activity date: 02/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }