Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2017 | DEV PKG - REVISION | 02/08/2017 | ACTIVE |
07/28/2016 | SITE and/or GRADING | 09/09/2016 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0127
Permit Description: SITE
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/22/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/22/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SITE IS LESS THAN 1 ACRE, THEREFORE A STORM WATER PERMIT/PLAN IS NOT REQUIRED. 2) ENSURE SITE IS CONSTRUCTED PER THE APPROVED PLANS 3) ENSURE HC PARKING AND ACCESS MEET ADA REQUIREMENTS 4) ENSURE LANDSCAPING IS COMPLETED PER PLAN 5) CALL FOR INSPECTION FOR ANY SITE CHANGES AND/OR CONCERNS} |
|
02/02/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
02/02/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
02/02/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/10/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CONCERNS AT THIS TIME} | |
02/02/2017 | ENGR Grading Final | Passed | {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
02/02/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
02/02/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 02/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
02/13/2017 | ENGR Engineering Final | Passed | {Activity date: 02/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |