Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
07/14/2016
Applicant:
Description:
TENT PLAT/FLD - MOUNTAIN VAIL RESERVEOriginally approved 12/12/16 (22 pages)1st revision appro

Permit Reviews

Permit Number - DP16-0118
Permit Status: Complete
Permit Description: TENT PLAT/FLD - MOUNTAIN VAIL RESERVEOriginally approved 12/12/16 (22 pages)1st revision appro
Start Date Submittal Complete Date Status  
07/11/2017 REVISION - TENT PLAT & CORE RESUB 08/30/2017 COMPLETED Review Details
07/14/2016 DEV PKG - OK TO SUBMIT 07/15/2016 COMPLETED Review Details
07/15/2016 TENTATIVE PLAT REVIEW 09/19/2016 COMPLETED Review Details
08/30/2017 REVISION - TENT PLAT & CORE RESUB 10/26/2017 COMPLETED Review Details
10/05/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 11/08/2016 COMPLETED Review Details
12/01/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 07/11/2017 COMPLETED Review Details
12/07/2017 REVISION - TENT PLAT & CORE RESUB 01/09/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0118
Permit Description: TENT PLAT/FLD - MOUNTAIN VAIL RESERVEOriginally approved 12/12/16 (22 pages)1st revision appro
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/22/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/22/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 -
POC BORDERLAND: RANDY/BRAD 260-1079
DEVELOPER REP LANCEOSBORNE 975-2730

1) NPPO IS BEING COMPLETED PER THE APPROVED PLANS
2) INSTALL SEDIMENT CONTOLS ALONG THE NORTH/NORTHWEST END OF PROJECT
3) SWPPP AUTH # 92333
4) PUBLIC ROADWAYS, WEIR IN BASIN MULTIPLE COMMON AREAS.
5) INSTALL A STABILIZED ENTRANCE, AND CONCRETE WASH OUT ON SITE
6) POST A COPY OF YOUR NOI
7) SWEEP UP TRACKING AS NEEDED
8) PERFORM STORM WATER SELF INSPECTIONS PER SWPPP
}
03/15/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 03/15/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
04/01/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/01/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/01/2019 SITE - Stormwater Follow-up Passed {Activity date: 04/01/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/15/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
SWEEP TRACKED SOIL AS NEEDED}
04/01/2019 ENGR Grading Final Passed {Activity date: 04/01/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/01/2019 COT - ENGR - Signage Final Passed {Activity date: 04/01/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/18/2020 ENGR Engineering Final Passed {Activity date: 06/18/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED AT THIS TIME} ; {Activity date: 04/01/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Complete all work on approved plans before calling for final grading.} ; {Activity date: 04/01/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE ALL CLOSEOUT DOCUMENTATION FOR THIS SITE WHEN YOU WILL BE REQUESTING THIS SITE FOR A FULL CLOSEOUT. ONE FINAL WALK THROUGH OF THE SITE WILL BE DONE AT THAT TIME. CURRENTY 5 LOTS HAVE NOT BEEN CONSTRUCTED UPON, AND 7 OTHERS ARE BEING IN THE PROCESS OF BEING CONSTRUCTED.}
08/17/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/17/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/01/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE A MONITORING REPORT FROM THE LANDSCAPE ARCHITECT FOR ALL WORK ON THIS SITE.}
08/17/2020 SITE - Stormwater Final Inspection Passed {Activity date: 08/17/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/01/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THERE ARE 5 LOTS AT THIS TIME THAT HAVE NOT BEEN CONSTRUCTED ON AT THIS TIME, SO THE STORMWATER PERMIT NEEDS TO REMAIN ACTIVE. TO CLOSE THIS PERMIT THE DEVELOPER WILL NEED TO MAINTAIN THE CONTROLS UNDER HIS OWN SWPPP.
ONCE THE SITE IS COMPLETED YOU WILL NEED TO REMOVE ALL REMAINING STORMWATER CONTROLS FROM THIS SITE PRIOR TO SCEDULING ANOTHER INSPECTION. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE REMOVAL OF THE STORMWATER WATTLE. THE STRAW FROM THE WATTLE CAN REMAIN ON SITE BUT THE NETTING MATERIAL NEEDS TO BE REMOVED FROM THIS SITE. A WALK THROUGH OF THE SITE WILL BE PERFORMED TO VERIFY THAT ALL MATERIAL IS REMOVED PRIOR TO APPROVING THIS SITE FULLY.
PROVIDE THIS DEPARTMENT WITH A COPY OF THE NOTICE OF TERMINATION FROM A.D.E.Q..}