Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3324 W BIG DIPPER DR
Apply Date:
05/05/2016
Applicant:
Description:
GRADING - NEW SFR T16CM03352

Permit Reviews

Permit Number - DP16-0076
Permit Status: Complete
Permit Description: GRADING - NEW SFR T16CM03352
Start Date Submittal Complete Date Status  
05/05/2016 DEV PKG - OK TO SUBMIT (GRADING ONLY) 05/05/2016 COMPLETED Review Details
05/05/2016 GRADING 06/13/2016 COMPLETED Review Details
06/13/2016 RESUB - SITE and/or GRADING 07/06/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0076
Permit Description: GRADING - NEW SFR T16CM03352
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/29/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE .}
04/12/2017 SITE - Stormwater Follow-up Passed {Activity date: 04/12/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/16/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP CONTROLS INSTALLED. 18'' CMP INSTALLED IN DRIVE.}
04/12/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 04/12/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
04/12/2017 COT - ENGR - Signage Final Passed {Activity date: 04/12/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/04/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/04/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/04/2017 ENGR Engineering Final Passed {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/04/2017 ENGR Grading Final Passed {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/04/2017 SITE - Stormwater Final Inspection Passed {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }