Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP16-0027
Permit Details
Apply Date:
02/11/2016
Applicant:
Description:
SITE/GRADE/SWPPP - UMC BANNER
Permit Reviews
Permit Number - DP16-0027
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - UMC BANNER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/11/2016 | DEV PKG - OK TO SUBMIT | 02/11/2016 | COMPLETED |
02/11/2016 | DEV PKG | 04/20/2016 | COMPLETED |
02/26/2018 | DEV PKG - REVISION | 04/13/2018 | COMPLETED |
04/13/2018 | DEV PKG - REVISION | 07/19/2018 | COMPLETED |
04/20/2016 | DEV PKG - RESUBMITTAL | 06/02/2016 | COMPLETED |
06/09/2016 | DEV PKG - RESUBMITTAL | 09/23/2016 | COMPLETED |
10/04/2016 | DEV PKG - REVISION | 12/01/2016 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0027
Permit Description: SITE/GRADE/SWPPP - UMC BANNER
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/24/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
12/24/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
12/24/2020 | ENGR Engineering Final | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/23/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - not ready.} ; {Activity date: 12/22/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, PLANS ARE NOT AVAILABLE AT THIS TIME. THIS INSPECTION WILL BE RESCHEDULED FOR 12/24/2020 WHEN A FULL SET OF THE PLANS CAN BE MADE AVAILABLE.} | |
12/24/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
12/24/2020 | ENGR Grading Final | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
12/24/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
12/24/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
12/24/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
12/24/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 12/24/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |