Description:
SITE/GRADE/SWPPP/MGD - Maingate Phase 5, Mixed use, Graduate Tucson Hotel and the Collective Apartme

Permit Reviews

Permit Number - DP16-0026
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP/MGD - Maingate Phase 5, Mixed use, Graduate Tucson Hotel and the Collective Apartme
Start Date Submittal Complete Date Status  
02/11/2016 DEV PKG - OK TO SUBMIT 02/11/2016 COMPLETED Review Details
02/11/2016 DEV PKG 03/24/2016 COMPLETED Review Details
02/25/2019 DEV PKG - REVISION 03/27/2019 COMPLETED Review Details
03/24/2016 DEV PKG - RESUBMITTAL 07/31/2018 COMPLETED Review Details
05/22/2020 DEV PKG - OK TO SUBMIT 06/25/2020 COMPLETED Review Details
06/25/2020 REVISION - - 2ND 08/27/2020 COMPLETED Review Details
07/31/2018 DEV PKG - REVISION 09/20/2018 COMPLETED Review Details
09/20/2018 DEV PKG - REVISION 12/12/2018 COMPLETED Review Details
12/12/2018 DEV PKG - REVISION 02/25/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0026
Permit Description: SITE/GRADE/SWPPP/MGD - Maingate Phase 5, Mixed use, Graduate Tucson Hotel and the Collective Apartme
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/20/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/20/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/20/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 08/20/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/20/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/20/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/20/2020 COT - ENGR - Signage Final Passed {Activity date: 08/20/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/02/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/02/2021; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - } ; {Activity date: 08/20/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NONE OF THIS WORK HAS BEEN COMPLETED AT THIS TIME AND WILL BE INSPECTED AT A LATER DATE.}
02/02/2021 SITE - Stormwater Follow-up Passed {Activity date: 02/02/2021; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - } ; {Activity date: 08/20/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, ALL DRAINAGE APPEARS TO BEING HANDLED AS DESIGNED.}
02/02/2021 SITE - Stormwater Final Inspection Passed {Activity date: 02/02/2021; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - }
02/16/2021 ENGR Engineering Final Passed {Activity date: 02/16/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/02/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VLEON1 - PARTIAL PENDING THE REPLACEMENT OF THE TREES THAT HAVE BEEN REMOVED ALONG THE WEST SIDE OF THIS SITE} ; {Activity date: 08/20/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR A TCO FOR THIS SITE AT THIS TIME BUT NOT FOR THE FINAL. I WALKED THE SITE AND LOOKED FOR ANY CONDITION THAT NEEDED ATTENTION PRIOR TO OCCUPANCY BEING GRANTED. HAVE ADVISED THE CONTRACTOR TO REMOVE ALL CONSTRUCTION MATERIALS WITHIN THE PEDESTRIAN ACCESS AREAS, AND PERFORM SOME MINOR CLEANUP OF THE SITE.}
03/05/2021 ENGR Grading Final Passed {Activity date: 03/05/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/18/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Permit is in final status. All inspections have been approved} ; {Activity date: 08/20/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
REV-1_4_COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
REV-1_4_DEVELOPMENT PACKAGE.PDF DOCUMENTS VIEW
REV-1_4_REAL ESTATE LEGALS.PDF DOCUMENTS VIEW
REV-2 DEVELOPMENT PACKAGE.PDF DOCUMENTS VIEW
REV-2 RAC ARC SPECIFICATIONS, BIKE ARC.PDF DOCUMENTS VIEW
REV-2 REVISION LETTER, 06.22.2020.PDF DOCUMENTS VIEW
1-28 OF 28.PDF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
GEOTECH REPORT DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
TIA.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
ADDENDUM DRAINAGE REPORT_09.26.2018.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW