Permit Details

Status:
Complete
Type:
Development Package
Address:
802 N 4TH AV
Address NEW:
802 N 4TH AV
Apply Date:
02/05/2016
Applicant:
Description:
RESTAURANT

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0023
Permit Description: RESTAURANT
Total Completed Inspections - 11
Date Description Inspector Results Comments
01/04/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/04/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/04/2017 SITE - Stormwater Follow-up Passed {Activity date: 10/07/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CREW WORKING ON INSTALLING AND BACKFILLING THE UNDERGROUND 96" BASIN} ; {Activity date: 01/04/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/04/2017 SITE - Stormwater Final Inspection Passed {Activity date: 01/04/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/04/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 01/04/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/04/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/06/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/04/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/04/2017 COT - ENGR - Signage Final Passed {Activity date: 01/04/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/01/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/04/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LANDSCAPING IS NOT PER THE APPROVED PLAN, REVISIONS WILL BE PROVIDED SHOWING THE PLANTS IN THEIR CURRENT LOCATION.}
02/03/2017 SITE - Zoning Final Passed {Activity date: 02/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/06/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS OR PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO PROVIDE A CERTIFICATION LETTER FOR THIS SITE FROM THE ENGINEER OF RECORD.}
02/03/2017 ENGR Engineering Final Passed {Activity date: 02/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/01/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL FOR RE-INSPECTION, PROVIDE AN APPROVED REVISION FOR INSPECTION} ; {Activity date: 01/06/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS OR PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO PROVIDE A CERTIFICATION LETTER FOR THIS SITE FROM THE ENGINEER OF RECORD.}
02/03/2017 ENGR Grading Final Passed {Activity date: 02/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/04/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS OR PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. ALSO PROVIDE A CERTIFICATION LETTER FOR THIS SITE FROM THE ENGINEER OF RECORD.}
07/02/2017 RSBU - Building Final Passed {Activity date: 07/02/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
INCORRECT ADDRESS.DOC DEVELOPMENT PACKAGE VIEW
001_ARCHITECTURAL SITE PLAN_DP-1.TIF DEVELOPMENT PACKAGE VIEW
002_LANDSCAPE_DP-2.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW