Status:
Issued
Type:
Development Package
Address:
2901 E ELVIRA RD
Address NEW:
2901 E ELVIRA RD
Apply Date:
02/03/2016
Applicant:
Description:
SITE

Permit Reviews

Permit Number - DP16-0018
Permit Status: Issued
Permit Description: SITE
Start Date Submittal Complete Date Status  
02/03/2016 DEV PKG - OK TO SUBMIT 02/03/2016 COMPLETED Review Details
02/03/2016 SITE and/or GRADING 03/04/2016 COMPLETED Review Details
03/15/2016 RESUB - SITE/GRADING ALL 04/15/2016 COMPLETED Review Details
04/15/2016 RESUB - SITE/GRADING ALL 06/08/2016 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP16-0018
Permite Description: SITE
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Follow-up N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP16-0018
Permit Description: SITE
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/12/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 07/12/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/22/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2016 SITE - Stormwater Final Inspection Passed {Activity date: 08/22/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/22/2016 COT - ENGR - Signage Final Passed {Activity date: 08/22/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/26/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/26/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/26/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/26/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - DOES NOT NEED TO BE ACCESSIBLE PER STEVE SHIELDS FROM COT ZONING.}
02/08/2024 ENGR Engineering Final Passed Water break in parking lot has been repaired and asphalt patched in parking lot (years ago)
03/11/2024 SITE - Stormwater Follow-up Passed
03/11/2024 ENGR Grading Final Passed