Permit Details

Status:
Complete
Type:
Development Package
Address:
9955 E 22ND ST
Address NEW:
9955 E 22ND ST
Apply Date:
12/09/2015
Applicant:
Michael John Baker
Description:
GRADING

Outstanding Inspections

Permit Status: Complete
Permit Number: DP15-0215
Permite Description: GRADING
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/23/2020 ENGR Engineering Final N/A Partial Pass {Activity date: 04/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/23/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE NEEDS THE CLOSEOUT DOCUMENTAION SO THAT IT CAN BE CLOSED OUT. PROVIDE REVISED DRAWINGS SHOWING ALL CHANGES THAT HAVE BEEN MADE TO THE SITE, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND THE NOTICE OF TERMINATION LETTER FROM ADEQ.} ; {Activity date: 07/27/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE GENERAL CLEANUP AROUND THE SITE PRIOR TO CAALLING IN FOR THIS FINAL INSPECTION.}

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0215
Permit Description: GRADING
Total Completed Inspections - 8
Date Description Inspector Results Comments
07/27/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/27/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/27/2017 SITE - Stormwater Follow-up Passed {Activity date: 07/27/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/27/2017 ENGR Grading Final Passed {Activity date: 07/27/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/27/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 07/27/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/27/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/27/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/27/2017 COT - ENGR - Signage Final Passed {Activity date: 07/27/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/23/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/10/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE AS SHOWN ON THE APPROVED PLANS}
04/23/2020 SITE - Stormwater Final Inspection Passed {Activity date: 04/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/27/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - REMOVAL ALL THE STORMWATER CONTROLS FROM THE SITE AND REMOVE MINOR SILT BUILD UPWITHIN THE BASIN}

Documents

File Name Document Type  
001_COVER SHEET / NOTES / INDEX / LEGEND_1 OF 3.TIF DEVELOPMENT PACKAGE VIEW
002_RED COLT ROAD PLAN / DETAILS_2 OF 3.TIF DEVELOPMENT PACKAGE VIEW
003_SECTIONS / DETAILS_3 OF 3.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW