Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
2475 N JACKRABBIT AV
Apply Date:
12/04/2015
Applicant:
Description:
SITE/GRADING-NEW BUILDING WITH PARKING

Permit Reviews

Permit Number - DP15-0212
Permit Status: Complete
Permit Description: SITE/GRADING-NEW BUILDING WITH PARKING
Start Date Submittal Complete Date Status  
02/26/2016 RESUB - SITE and/or GRADING 03/29/2016 COMPLETED Review Details
03/29/2016 RESUB - SITE and/or GRADING 04/04/2016 ACTIVE Review Details
12/04/2015 DEV PKG - OK TO SUBMIT 12/14/2015 COMPLETED Review Details
12/15/2015 SITE and/or GRADING 02/05/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0212
Permit Description: SITE/GRADING-NEW BUILDING WITH PARKING
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/24/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/24/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND ADVISED HIM THAT HE NEEDS A SET OF PLANS ON THE SITE AND TO MAKE SURE THAT THEY HAVE ADDRESSED THE STORMWATER CONTROLS AS NEEDED.}
06/21/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 06/21/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) FOLLOW UP INSPECTION - SITE IS LESS THAN 1 ACRE THEREFORE A STORM WATER PERMIT IS NOT REQUIRED
2) PROTECT ADJACENT ROADWAY AND DRAINAGE FROM CONSTRUCTION DEBRIS
3) CALL FOR INSPECTION FRO TRASH ENCLOSURE FOOTINGS AND RE-BAR LAY OUT
4) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS}
06/06/2017 SITE - Stormwater Follow-up Passed {Activity date: 06/06/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/14/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SWEEP UP TRACKED SOIL AS NEEDED} ; {Activity date: 01/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/07/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/31/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
06/06/2017 ENGR Grading Final Passed {Activity date: 06/06/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/14/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PAVING IN THREE WEEKS.
INDOOR BIKE PARKING
FOLLOW UP FOR SITE WORK} ; {Activity date: 09/19/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) RE-BAR INSTALLED PER PLAN FOR TRASH ENCLOSURE, OK TO POUR FOOTINGS
2) DEPTH OF TRASH ENCLOSURE PAD < 10' BY 8" BECAUSE OF CENTER COLUMN.}
06/23/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/06/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE ALL SITE WORK SHOWN ON THE APPROVED PLAN TO INCLUDE BUT NOT LIMITED TO LANDSCAPING, STRIPING, FLAT WORK, GATES AND ALL OTHER SITE CONSTRUCTION.
2) PROVIDE A CERT STATEMENT FROM THE EOR
3) CALL FOR FINAL GRADING INSPECTION FOR PERMIT # DP15-0212}
06/23/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/23/2017 ENGR Engineering Final Passed {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/06/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE ALL SITE WORK SHOWN ON THE APPROVED PLAN TO INCLUDE BUT NOT LIMITED TO LANDSCAPING, STRIPING, FLAT WORK, GATES AND ALL OTHER SITE CONSTRUCTION.
2) PROVIDE A CERT STATEMENT FROM THE EOR
3) CALL FOR FINAL GRADING INSPECTION FOR PERMIT # DP15-0212}
06/23/2017 SITE - Stormwater Final Inspection Passed {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/06/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ}
06/23/2017 COT - ENGR - Signage Final Passed {Activity date: 06/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_GENERAL NOTES FOR SITE / GRADING_1 OF 10.TIF DEVELOPMENT PACKAGE VIEW
002_CONSTRUCTION DETAILS_2 OF 10.TIF DEVELOPMENT PACKAGE VIEW
003_EXISTING CONDITIONS / DEMOLITION_3 OF 10.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_4 OF 10.TIF DEVELOPMENT PACKAGE VIEW
005_PAVING / GRADING_5 OF 10.TIF DEVELOPMENT PACKAGE VIEW
006_PAVING / GRADING_6 OF 10.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_7 OF 10.TIF DEVELOPMENT PACKAGE VIEW
008_WATER HARVESTING_8 OF 10.TIF DEVELOPMENT PACKAGE VIEW
009_IRRIGATION_9 OF 10.TIF DEVELOPMENT PACKAGE VIEW
010_IRRGATION DETAILS_10 OF 10.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW