Permit Details

Status:
Complete
Type:
Development Package
Address:
6044 E 30TH ST
Address NEW:
6044 E 30TH ST
Apply Date:
10/16/2015
Applicant:
Description:
SITE

Permit Reviews

Permit Number - DP15-0180
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
10/16/2015 SITE and/or GRADING 10/22/2015 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0180
Permit Description: SITE
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/14/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
04/14/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
04/14/2020 ENGR Engineering Final Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
04/14/2020 SITE - Stormwater Follow-up Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
04/14/2020 ENGR Grading Final Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
04/14/2020 SITE - Stormwater Final Inspection Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
04/14/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - engineering preconstruction meeting.}
04/14/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
04/14/2020 COT - ENGR - Signage Final Passed {Activity date: 04/14/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }

Documents

File Name Document Type  
001_COVER SHEET_G1.TIF DEVELOPMENT PACKAGE VIEW
002_DEMOLITION / PROPOSED FLOOR PLANS_A1.TIF DEVELOPMENT PACKAGE VIEW
003_FLOOR / REFLECTED CEILING PLAN_A2.TIF DEVELOPMENT PACKAGE VIEW
004_SECTIONS / ELEVATIONS_A3.TIF DEVELOPMENT PACKAGE VIEW
005_DETAILS_A4.TIF DEVELOPMENT PACKAGE VIEW
006_FLOOR PLAN / HVAC_M1.TIF DEVELOPMENT PACKAGE VIEW
007_FLOOR PLAN / HVAC_M2.TIF DEVELOPMENT PACKAGE VIEW
008_ELECTRICAL NOTES / SYMBOLS / ABBREVIATIONS_E0.0.TIF DEVELOPMENT PACKAGE VIEW
009_ELECTRICAL LIGHTING / POWER / SCHEDULES / CALCULATIONS_E1.0.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW