Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
925 W GRANT RD
Apply Date:
08/13/2015
Applicant:
Michael Baird
Description:
SITE; LOADING DOCK

Permit Reviews

Permit Number - DP15-0134
Permit Status: Complete
Permit Description: SITE; LOADING DOCK
Start Date Submittal Complete Date Status  
08/13/2015 SITE and/or GRADING 12/29/2015 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0134
Permit Description: SITE; LOADING DOCK
Total Completed Inspections - 10
Date Description Inspector Results Comments
02/08/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/08/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 02/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/08/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/08/2016 COT - ENGR - Signage Final Passed {Activity date: 02/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/08/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 02/08/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE PROJECT AS SHOWN ON THE APPROVED PLANS FOR THIS SITE PRIOR TO SCHEDULING THIS INSPECTION FOR THE FINAL}
07/08/2016 ENGR Engineering Final Passed {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 02/09/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE PROJECT AS SHOWN ON THE APPROVED PLANS FOR THIS SITE PRIOR TO SCHEDULING THIS INSPECTION FOR THE FINAL}
07/08/2016 SITE - Stormwater Follow-up Passed {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 02/08/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CONTRACTOR IS MONITORING THE SITE FOR ANY RUN OFF}
07/08/2016 ENGR Grading Final Passed {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
07/08/2016 SITE - Stormwater Final Inspection Passed {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 02/08/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE PROJECT AS SHOWN ON THE APPROVED PLANS FOR THIS SITE PRIOR TO SCHEDULING THIS INSPECTION FOR THE FINAL}
07/01/2017 RSBU - Building Final Passed {Activity date: 07/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_C1.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_S1.TIF DEVELOPMENT PACKAGE VIEW
003_DEMOLITION_A1.TIF DEVELOPMENT PACKAGE VIEW
004_FLOOR / ACCESSIBILITY_A2.TIF DEVELOPMENT PACKAGE VIEW
005_EQUIPMENT_A3.TIF DEVELOPMENT PACKAGE VIEW
006_CEILING_A4.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILS_A5.TIF DEVELOPMENT PACKAGE VIEW
008_CONCEPT MATERIAL TUBING_A6.TIF DEVELOPMENT PACKAGE VIEW
009_CONCEPT MATERIAL TUBING_A7.TIF DEVELOPMENT PACKAGE VIEW
010_STRUCTURAL_S100.TIF DEVELOPMENT PACKAGE VIEW
011_MECHANICAL DEMO_MD1.TIF DEVELOPMENT PACKAGE VIEW
012_MECHANICAL FLOOR_M1.TIF DEVELOPMENT PACKAGE VIEW
013_MECHANICAL DETAILS_M2.TIF DEVELOPMENT PACKAGE VIEW
014_MECHANICAL SCHEDULE_M3.TIF DEVELOPMENT PACKAGE VIEW
015_PLUMBING FLOOR_P1.TIF DEVELOPMENT PACKAGE VIEW
016_COMPRESSED AIR / VACUUM_P2.TIF DEVELOPMENT PACKAGE VIEW
017_CHILLED WATER_P3.TIF DEVELOPMENT PACKAGE VIEW
018_DIAGRAMS / SCHEDULES_P4.TIF DEVELOPMENT PACKAGE VIEW
019_PLUMBING DETAILS_P5.TIF DEVELOPMENT PACKAGE VIEW
020_SPECIFICATIONS / NOTES_P6.TIF DEVELOPMENT PACKAGE VIEW
021_ELECTRICAL NOTES_E0.0.TIF DEVELOPMENT PACKAGE VIEW
022_ELECTRICAL SITE_E0.2.TIF DEVELOPMENT PACKAGE VIEW
023_ELECTRICAL DEMOLITION_ED1.0.TIF DEVELOPMENT PACKAGE VIEW
024_ELECTRICAL LIGHTING_E1.0.TIF DEVELOPMENT PACKAGE VIEW
025_ELECTRICAL POWER_E2.0.TIF DEVELOPMENT PACKAGE VIEW
026_ELECTRICAL MECHANICAL_E2.1.TIF DEVELOPMENT PACKAGE VIEW
027_SPECIAL SYSTEMS_E3.0.TIF DEVELOPMENT PACKAGE VIEW
028_PANEL_E4.0.TIF DEVELOPMENT PACKAGE VIEW
029_PANEL_E4.1.TIF DEVELOPMENT PACKAGE VIEW
030_CONTROL SYSTEMS_E5.1.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW