Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
07/07/2015
Applicant:
Tracy Barnett - Murray
Description:
NEW RESTAURANTOriginally approved 1/15/2016 (17 pages)1st Revision approved 11/8/2016 (3)2nd

Permit Reviews

Permit Number - DP15-0103
Permit Status: Complete
Permit Description: NEW RESTAURANTOriginally approved 1/15/2016 (17 pages)1st Revision approved 11/8/2016 (3)2nd
Start Date Submittal Complete Date Status  
01/03/2017 DEV PKG - REVISION 01/03/2017 COMPLETED Review Details
01/11/2016 DEV PKG - RESUBMITTAL 01/14/2016 COMPLETED Review Details
01/14/2016 DEV PKG - RESUBMITTAL 01/21/2016 COMPLETED Review Details
03/24/2017 DEV PKG - REVISION 03/24/2017 COMPLETED Review Details
07/07/2015 DEV PKG - OK TO SUBMIT 07/07/2015 COMPLETED Review Details
07/07/2015 DEV PKG 09/03/2015 COMPLETED Review Details
09/15/2015 DEV PKG - RESUBMITTAL 10/21/2015 COMPLETED Review Details
11/08/2016 DEV PKG - REVISION 11/08/2016 COMPLETED Review Details
11/16/2015 DEV PKG - RESUBMITTAL 01/11/2016 COMPLETED Review Details
12/22/2016 DEV PKG - REVISION 12/27/2016 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP15-0103
Permit Status: Complete
Permit Description: NEW RESTAURANTOriginally approved 1/15/2016 (17 pages)1st Revision approved 11/8/2016 (3)2nd
Total Outstanding Activity Conditions - 4
Date Name
01/11/2016 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/11/2016 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/11/2016 AS BUILTS REQUIRED
01/15/2016 The following 8 conditions apply to permit DP15-0103:1)Two copies of the SWPPP Report shall be submitted to Engineering Reviewer and one copy of accepted report shall be provided at Pre-construction Meeting.2)Call for SWPPP inspection and Grading Pre-construction meeting. For a PDSD Engineering Inspections, call IVR (791-3111), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888. Call for inspections of SWPP control installation, stormdrain improvements, scuppers, and other inspections as discussed with Inspector at time of Pre-con meeting.3)There shall be no disturbance outside of the approved grading limits. Any grading outside of the grading limits requires separate grading permit or a submittal, review, and approval for separate permits.4)There shall be positive gradient provided from edge of building away from building and toward scuppers. Positive gradient shall be provided in periphery graded areas around site so that no ponding occurs.5)Temporary SWPP controls shall be maintained during construction until all permanent control installations are completed. 6)If there are any revisions to design or construction, contact PDSD Engineering Inspector or PDSD Engineering Civil Engineer to discuss proposed change to determine whether one of the following may be needed: notation of change may be needed in system and later as-built, details of change, or revised plan submittal. 7)With as-built submittal, provide copy of Revision application with cover letter explaining revisions as as-built conditions. Provide also certification statements from Registrant (for overall project substantial completion as well as drainage infrastructure installation) prior to approval of final grading. Include as-built elevations of invert elevations of stormdrain pipe system, inverts of inlet and outlets of surface drainage system, FFE of building, and other elevations as deemed necessary by RLS.8)Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all erosion control measures, have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed.

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0103
Permit Description: NEW RESTAURANTOriginally approved 1/15/2016 (17 pages)1st Revision approved 11/8/2016 (3)2nd
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/01/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/01/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/29/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/29/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 12/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/29/2016 SITE - Stormwater Follow-up Passed {Activity date: 12/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/14/2016; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ABOUT REPAIRING AND REPLACEING SWPPP CONTROLS .} ; {Activity date: 10/06/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GC NOT ON SITE .SWPPP REPAIRS NEED TO BE MADE. CALLED GC BUT NO ANSWER.} ; {Activity date: 09/09/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT TRACK OUT TO CLEAN STREETS.} ; {Activity date: 08/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 07/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/22/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CITY AP PLANS ON SITE FOR HIGH LIGHTS FOR STROM WATER PIPING.} ; {Activity date: 06/16/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/03/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 04/04/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THISTIME.} ; {Activity date: 03/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP INFO HAS BEEN INSTALLED.} ; {Activity date: 03/18/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP INFO STILL NOT AT GATE.}
12/29/2016 ENGR Grading Final Passed {Activity date: 12/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/29/2016 SITE - Stormwater Final Inspection Passed {Activity date: 12/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.}
12/29/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 12/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/29/2016 COT - ENGR - Signage Final Passed {Activity date: 12/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
03/27/2017 ENGR Engineering Final Passed {Activity date: 03/27/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/15/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ONSITE WITH tRACY AND LOOKED OVER THE AREAS FOR THE REMAINING CONCERNS FOR THIS SITE. 1) TRACY WILL PROVIDE THE REVISIONS FOR THE CHANGES THAT WERE NOT REVISED ON THE DRAWINGS ON THE LAST REVISIONS. THIS WILL INCLUDE A SIDEWALK SCUPPER, THE ELIMINATION OF A DRAINAGE STRUCTURE IN THE 30' FOOT DRIVE AREA, AND THE LANDSCAPE MODIFICATIONS.} ; {Activity date: 03/10/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CHECKED OVER THE SITE AND NOTED THE FOLLOWING ITEMS WILL NEED TO BE ADDRESSED PRIOR TO CALLING IN FOR THE FINAL GRADING INSPECTION.
1) MAKE CORRECTIONS TO THE SITE THAT ARE NOT PER THE APPROVED PLANS OR PROVIDE REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. SEE NOTES #26 AND #27 FOR A SIDEWALK SCUPPER THAT WAS ELIMINATEDON THE SIDEWALK BETWEEN THE BUFFET AND PARK AVENUE. ALSO ALL OF THE DRAINAGE OPENNINGS HAVE NOT BEEN INSTALLED ON THE WEST SIDE OF THE NEW 30 FOOT DRIVE FROM TUCSON MARKET PLACE BOULEVARD INTO THIS BUILDING.
2) CONSTRUCTION EQUIPMENT(SCAFFOLDING) HAS BEEN LEFT ON THE SITE AT THE SOUTHEAST CORNER OF THE SITE.
3) INSTALL ALL TREES AS SHOWN ON THE APPROVED PLANS, SOME OF THE TREES HAVE BEEN DELETED NEAR THE TRASH ENCLOSURE FOR THIS SITE.
4)REMOVE 2 SMALL PILES OF ROCK THAT HAVE BEEN LEFT IN THE AREA JUST NORTH OF THIS SITE.
5) CLEAN AND REMOVE ALL PAINT, TRASH, AND DEBRIS FROM THE AREA EAST OF THE TRASH ENCLOSURE.} ; {Activity date: 01/04/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CERT LETTER FROM ENGINEER OF RECORD. COMPLET STABILIZAION PER LAST INSPECTION.} ; {Activity date: 12/29/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE FILTER FABRIC UNDRE RIP-RAP. PROVIDE SABILZATION AT ALL DISRUBED AREAS AROUND SITE. PROVIDE ADA SIGNS AT ADA PARKING. PROVIDE CERT LETTER. REMOVE ALL CONSTRUCTION MATERIAL FROM AROUND SITE. COMLPET HOLES FOR TASH ENCLOUSWE GATES.} ; {Activity date: 11/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON FINAL GRADING FOR PAVING.}

Documents

File Name Document Type  
SWG REVIEW FOR LINS GRAND BUFFET DP15-0103.PDF DOCUMENTS VIEW
2015-05 SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
TW DP15-0103.PDF DOCUMENTS VIEW
PAG DP15-0103 LINS GRAND BUFFET (1).PDF DOCUMENTS VIEW
PAG DP15-0103 LINS GRAND BUFFET (2).PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
001_COVER SHEET_DP-1.TIF DEVELOPMENT PACKAGE VIEW
002_TRACKING TABLE_DP-2.TIF DEVELOPMENT PACKAGE VIEW
003_SITE DETAILS_DP-3.TIF DEVELOPMENT PACKAGE VIEW
004_SITE / NOTES_SP-1.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / DRAINAGE COVER_G-1.TIF DEVELOPMENT PACKAGE VIEW
006_GRADING / DRAINAGE PLAN NORTH_G-2.TIF DEVELOPMENT PACKAGE VIEW
007_GRADING / DRAINAGE PLAN SOUTH_G-3.TIF DEVELOPMENT PACKAGE VIEW
008_GRADING / DRAINAGE DETAILS_G-4.TIF DEVELOPMENT PACKAGE VIEW
009_STROMWATER MANAGEMENT NOTES_SWMP-1.TIF DEVELOPMENT PACKAGE VIEW
010_STORMWATER MANAGEMENT_SWMP-2.TIF DEVELOPMENT PACKAGE VIEW
011_PRIVATE UTILITY NOTES_U-1.TIF DEVELOPMENT PACKAGE VIEW
012_PRIVATE UTILITY_U-2.TIF DEVELOPMENT PACKAGE VIEW
013_LANDSCAPE COVER SHEET_CVR.TIF DEVELOPMENT PACKAGE VIEW
014_LANDSCAPE_L-1.TIF DEVELOPMENT PACKAGE VIEW
015_IRRIGATION_L-2.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE DETAILS_L-3.TIF DEVELOPMENT PACKAGE VIEW
017_IRRIGATION DETAILS_L-4.TIF DEVELOPMENT PACKAGE VIEW