Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
07/06/2015
Applicant:
Lisa Bowers
Description:
SITE

Permit Reviews

Permit Number - DP15-0101
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
07/06/2015 SITE and/or GRADING 07/08/2015 COMPLETED Review Details
07/08/2015 SITE and/or GRADING 08/06/2015 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0101
Permit Description: SITE
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/30/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/30/2020 ENGR Engineering Final Passed {Activity date: 01/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/30/2020 ENGR Grading Final Passed {Activity date: 01/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/30/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
ARCHITECTURE VARIANCE DOCUMENT RINCON KNOLLS.PDF DOCUMENTS VIEW
001_TITLE PAGE / DRAWING INDEX_A0.0.TIF DEVELOPMENT PACKAGE VIEW
002_COVER_C1.0.TIF DEVELOPMENT PACKAGE VIEW
003_DEMOLITION / SITE_C2.0.TIF DEVELOPMENT PACKAGE VIEW
004_HORIZONTAL CONTROL / GRADING_C3.0.TIF DEVELOPMENT PACKAGE VIEW
005_DETAILS_C4.0.TIF DEVELOPMENT PACKAGE VIEW
006_SITE_A1.0.TIF DEVELOPMENT PACKAGE VIEW
007_ELECTRICAL SYMBOLS / ABBREVIATIONS_E0.0.TIF DEVELOPMENT PACKAGE VIEW
008_SITE_E1.0.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW