Permit: DP15-0086
Permit Details
Apply Date:
05/29/2015
Applicant:
Description:
SITE/GRADING/SWPPP - NEW FITNESS CENTER
Permit Reviews
Permit Number - DP15-0086
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - NEW FITNESS CENTER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/08/2016 | REVISION - SITE | 05/04/2016 | COMPLETED |
| 05/29/2015 | DEV PKG - OK TO SUBMIT | 05/29/2015 | COMPLETED |
| 05/29/2015 | SITE and/or GRADING | 07/02/2015 | COMPLETED |
| 07/02/2015 | RESUB - SITE/GRADING ALL | 07/21/2015 | COMPLETED |
| 07/21/2015 | RESUB - SITE and/or GRADING | 07/27/2015 | COMPLETED |
| 07/27/2015 | SITE and/or GRADING | 07/29/2015 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP15-0086
Permite Description: SITE/GRADING/SWPPP - NEW FITNESS CENTER
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2016 | SITE - Stormwater Final Inspection | N/A | Complete (Recurring) | {Activity date: 03/21/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0086
Permit Description: SITE/GRADING/SWPPP - NEW FITNESS CENTER
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/11/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH TIM THE GC.} | |
| 09/01/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/01/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 03/21/2016 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/21/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 03/21/2016 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/21/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/31/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON SWPPP CONTROLS AND SIGN AT GATE.} | |
| 03/21/2016 | COT - ENGR - Signage Final | Passed | {Activity date: 03/21/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 03/25/2016 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/25/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 03/25/2016 | ENGR Grading Final | Passed | {Activity date: 03/25/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 05/03/2016 | ENGR Engineering Final | Passed | {Activity date: 05/03/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT COMPLETE AT THIS TIME AND SHOULD HAVE NOT BEEN CLOSED OUT AS IT HAS BEEN. IF THERE IS ANY DAMAGE CAUSED TO THE SITE IT WILL THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO MAKE THE NECESSARY REPAIRS TO THE SITE. THIS SITE WILL BE INSPECTED AFTER ALL OF THE WORK FOR THE TI HAS BEEN COMPLETED AND THE EXCESS MATERIAL HAS BEEN REMOVED FROM THE SITE.} ; {Activity date: 03/25/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE WHEEL STOP AT ADA PARKING AREA. COMPLET ALL OUT SIDE WORK PER AP PLANS. PROVE CERT LETTER AND AP COT AS- BUILTS.} ; {Activity date: 03/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |