Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP15-0066
Permit Details
Apply Date:
04/21/2015
Applicant:
Kevin Hall
Description:
GRADING ONLY BROADWAY FESTIVAL
Permit Reviews
Permit Number - DP15-0066
Permit Status: Complete
Permit Description: GRADING ONLY BROADWAY FESTIVAL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/28/2016 | REVISION - GRADING | 02/02/2016 | COMPLETED |
04/21/2015 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 04/21/2015 | COMPLETED |
04/21/2015 | GRADING | 06/16/2015 | COMPLETED |
04/21/2016 | REVISION - GRADING | 04/21/2016 | COMPLETED |
06/16/2015 | GRADING | 07/13/2015 | ACTIVE |
07/13/2015 | RESUB - SITE and/or GRADING | 07/21/2015 | COMPLETED |
08/07/2015 | REVISION - GRADING | 08/19/2015 | COMPLETED |
08/19/2015 | REVISION - GRADING | 08/19/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0066
Permit Description: GRADING ONLY BROADWAY FESTIVAL
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/30/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/30/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
03/14/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/14/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
03/14/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/14/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
03/14/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/14/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
03/15/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/15/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/15/2017 | ENGR Engineering Final | Passed | {Activity date: 03/15/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/08/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ONE ON SITE SAID THEY CALLED FOR INSPECTION.} | |
03/15/2017 | ENGR Grading Final | Passed | {Activity date: 03/15/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |