Permit: DP15-0017
Permit Details
Apply Date:
02/04/2015
Applicant:
Description:
DP - NEW CONSTRUCTION- FRIEND OF PC LIBRARY Originally approved 3/25/2016 (15 pages)
Permit Reviews
Permit Number - DP15-0017
Permit Status: Complete
Permit Description: DP - NEW CONSTRUCTION- FRIEND OF PC LIBRARY Originally approved 3/25/2016 (15 pages)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/07/2016 | DEV PKG - RESUBMITTAL | 02/05/2016 | COMPLETED |
02/04/2015 | DEV PKG - OK TO SUBMIT | 02/05/2015 | COMPLETED |
02/05/2016 | DEV PKG - RESUBMITTAL | 02/05/2016 | ACTIVE |
02/09/2015 | DEV PKG | 04/01/2015 | COMPLETED |
08/24/2015 | DEV PKG - RESUBMITTAL | 11/20/2015 | COMPLETED |
11/20/2015 | DEV PKG - RESUBMITTAL | 12/22/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0017
Permit Description: DP - NEW CONSTRUCTION- FRIEND OF PC LIBRARY Originally approved 3/25/2016 (15 pages)
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/08/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SWPPP REQUIRED SMALL PARKING LOT CALL FOR INSPECTION FOR ANY UNDERGROUND UTILITY WORK, OR FOR ANY CHANGES OR CONCERNS.} |
|
09/13/2016 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/13/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
09/13/2016 | ENGR Engineering Final | Passed | {Activity date: 09/13/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
09/13/2016 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/13/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
09/13/2016 | ENGR Grading Final | Passed | {Activity date: 09/13/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 07/18/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - RE-BAR LAYOUT FOR TRASH ENCLOSURE PAD INSTALLED PER APPROVED PLAN - OK TO POUR CONCRETE} ; {Activity date: 04/22/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CREW WORKING ON GRADING THE AREA AND ARE SCHEDULED TO PAVE THE AREA IN THE NEXT TWO WEEKS.} |