Permit: DP14-0214
Permit Details
Status:
Complete
Type:
Development Package
Address:
3163 W MOCKINGBIRD LN
Address NEW:
3163 W MOCKINGBIRD LN
Apply Date:
11/20/2014
Applicant:
Description:
ENCHANTED HILLS GRADING
Permit Reviews
Permit Number - DP14-0214
Permit Status: Complete
Permit Description: ENCHANTED HILLS GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/20/2014 | GRADING | 11/24/2014 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP14-0214
Permit Status: Complete
Permit Description: ENCHANTED HILLS GRADING
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/20/2014 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 11/20/2014 | The following 10 conditions apply to this grading permit DP14-0214:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department - Angie 837-4917, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Copy of approved plan/permit DP14-0214 shall be kept at site at all times until final grading approval.3)These sets of plans act as the approved grading plan for ERZ/HDZ/floodplain and site plan compliance. 4)There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. 5)PDSD Inspector shall be called to inspect special grading, such as drainage, outlet when under construction. 6)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 7)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.8)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 9)Permittee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of handplaced rip-rap and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in decorative colored gravel or handplaced rock, unless other material is proposed, reviewed for HDZ compliance, and accepted by City of Tucson.10)Temporary erosion and sediment control devices may be needed and placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering streets or any drainage ways. Any interim erosion and sediment controls that are installed should be maintained at downstream areas of disturbance limits. These interim controls must be removed after all permanent controls have been established. |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0214
Permit Description: ENCHANTED HILLS GRADING
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/18/2022 | ENGR Engineering Final | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/18/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/18/2022 | ENGR Grading Final | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/18/2022 | SITE - Stormwater Final Inspection | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/18/2022 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 10/18/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |