Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9046 S HOUGHTON RD
Apply Date:
11/04/2014
Applicant:
Description:
GRADING/SWPPP - SHOPS AT HOUGHTON TOWN CENTER

Permit Reviews

Permit Number - DP14-0205
Permit Status: Complete
Permit Description: GRADING/SWPPP - SHOPS AT HOUGHTON TOWN CENTER
Start Date Submittal Complete Date Status  
02/11/2015 GRADING 03/19/2015 COMPLETED Review Details
04/01/2015 REVISION - GRADING 04/02/2015 COMPLETED Review Details
11/04/2014 GRADING 11/04/2014 COMPLETED Review Details
11/04/2014 GRADING 12/18/2014 COMPLETED Review Details
12/30/2014 RESUB - SITE and/or GRADING 02/11/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0205
Permit Description: GRADING/SWPPP - SHOPS AT HOUGHTON TOWN CENTER
Total Completed Inspections - 8
Date Description Inspector Results Comments
03/25/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS ARE IN PLACE
2) ENSURE THE APPROVED STORM WATER PLAN IS COMPLIED WITH
3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE
4) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS}
04/03/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 04/03/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER TO THE SITE
2) ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION PER YOUR PLAN}
07/16/2015 SITE - Stormwater Follow-up Passed {Activity date: 07/16/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED FORMS FOR HC ACCESS AND HC RAMP
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 05/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/14/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON STEM WALL FOR BLDG.
2) NO STORM WATER CONCERNS AT THIS TIME}
08/05/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/05/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LANDSCAPING PER OVERALL DEVELOPMENT PLAN}
08/05/2015 ENGR Engineering Final Passed {Activity date: 08/05/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE/GRADING PER APPROVED PLANS} ; {Activity date: 07/16/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE YOU PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
2) COMPLETE ALL CONSTRUCTION
3) AS-BUILT DRAWING}
08/05/2015 ENGR Grading Final Passed {Activity date: 08/05/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED FORMS FOR HC ACCESS AND HC RAMP
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 05/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT SSITE/GRADING CONCERNS AT THIS TIME} ; {Activity date: 04/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE/GRADING AT THIS TIME.}
08/05/2015 SITE - Stormwater Final Inspection Passed {Activity date: 08/05/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU FILE A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 07/16/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL FOR INSPECTION PRIOR TO FINAL}
01/09/2017 RSBU - Building Final Passed {Activity date: 01/09/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }