Permit Details

Status:
Complete
Type:
Development Package
Address:
135 S WILMOT RD
Apply Date:
09/08/2014
Applicant:
Description:
KNEADERS BAKERY & CAFE

Permit Reviews

Permit Number - DP14-0152
Permit Status: Complete
Permit Description: KNEADERS BAKERY & CAFE
Start Date Submittal Complete Date Status  
02/04/2015 RESUB - SITE and/or GRADING 03/09/2015 COMPLETED Review Details
03/09/2015 RESUB - SITE and/or GRADING 03/12/2015 COMPLETED Review Details
03/12/2015 RESUB - SITE and/or GRADING 03/17/2015 COMPLETED Review Details
03/17/2015 RESUB - SITE and/or GRADING 03/19/2015 COMPLETED Review Details
04/16/2015 REVISION - SITE 04/20/2015 COMPLETED Review Details
09/08/2014 DEV PKG - OK TO SUBMIT 09/16/2014 COMPLETED Review Details
09/16/2014 DEV PKG - OK TO SUBMIT 09/16/2014 COMPLETED Review Details
09/16/2014 SITE and/or GRADING 11/25/2014 COMPLETED Review Details
11/25/2014 RESUB - SITE and/or GRADING 01/05/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0152
Permit Description: KNEADERS BAKERY & CAFE
Total Completed Inspections - 7
Date Description Inspector Results Comments
04/02/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/02/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN ONE ACRE THERRFORE NO SWPPP IS REQUIRED
2) SWEEP UP TRACKED SOIL ROUTINELY
3) CALL FOR ANY SITE CHANGES OR GRADING CONCERNS
4) CALL FOR ANY LANDSCAPE QUESTIONS}
06/29/2015 SITE - Stormwater Follow-up Passed {Activity date: 06/29/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/15/2015; Status: Continued; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR WORKIN ON BLDG PAD, UTILITIES, AND BLDG.
NO SITE WORK OR STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/09/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
06/29/2015 ENGR Grading Final Passed {Activity date: 06/29/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/15/2015; Status: Continued; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT SITE CONCERNS AT THIS TIME
2) ENSURE ANY SITE/GRADING/LANDSCAPING CHANGES ARE SHOWN ON THE APPROVED PLANS
3) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD PRIOR TO FINAL} ; {Activity date: 06/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLING FOOTING FOR TRASH ENCLOSURE
2) CONTRACTOR HAS INSTALLED MOST CURBING AND SOME SIDEWALKS
3) NEW SUPERINTENDENT ON SITE
4) NO SIGNIFICANTS STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL FOR ANY CHANGES TO THE APPROVED SITE/GRADING PLAN} ; {Activity date: 05/12/2015; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND OR CONCERNS WITH SITE WORK} ; {Activity date: 05/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE WORK AT THIS TIME
UTILITY WORK AND CONTRACTOR WORKING ON THE BLDG}
06/29/2015 SITE - Stormwater Final Inspection Passed {Activity date: 06/29/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/29/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 06/29/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
07/07/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/07/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/29/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOVE OR REMOVE WHEEL STOPS FOR ANGLED PARKING ALONG THE SOUTH SIDE OF THE BLDG. PROVENT VEHICLE OVERHANG INTO TRAVEL LANE
2) PROVIDE THE CITY OF TUCSON APPROVAL ON AS-BUILT DRAWING.
3) PROVIDE AN APPROVED AS-BUILT AND CERT STATEMENT FRON THE ENG OF RECORD AT INSPECTION
4) COMPLETE LANDSCAPING

CALL FOR RE-INSPECTION}
07/07/2015 ENGR Engineering Final Passed {Activity date: 07/07/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/29/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOVE OR REMOVE WHEEL STOPS FOR ANGLED PARKING ALONG THE SOUTH SIDE OF THE BLDG. PROVENT VEHICLE OVERHANG INTO TRAVEL LANE
2) PROVIDE THE CITY OF TUCSON APPROVAL ON AS-BUILT DRAWING.
3) PROVIDE AN APPROVED AS-BUILT AND CERT STATEMENT FRON THE ENG OF RECORD AT INSPECTION
4) COMPLETE LANDSCAPING

CALL FOR RE-INSPECTION}

Documents

File Name Document Type  
001_COVER_C0.1.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_C1.0.TIF DEVELOPMENT PACKAGE VIEW
003_DEMO_C1.1.TIF DEVELOPMENT PACKAGE VIEW
004_HORIZONTAL CONTROL_C1.2.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / DRAINAGE_C1.3.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_C1.4.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILS_C1.5.TIF DEVELOPMENT PACKAGE VIEW
008_UTILITY_C2.0.TIF DEVELOPMENT PACKAGE VIEW
009_EROSION CONTROL_C3.0.TIF DEVELOPMENT PACKAGE VIEW
010_EROSION CONTROL DETAILS_C3.1.TIF DEVELOPMENT PACKAGE VIEW
011_PLANTING_L-1.TIF DEVELOPMENT PACKAGE VIEW
012_IRRIGATION_L-2.TIF DEVELOPMENT PACKAGE VIEW
013_PLANTING / IRRIGATION DETAILS_L-3.TIF DEVELOPMENT PACKAGE VIEW
014_PLANTING SPECIFICATIONS_L-4.TIF DEVELOPMENT PACKAGE VIEW
015_IRRIGATION SPECIFICATIONS_L-5.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW