Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
09/03/2014
Applicant:
Description:
DP- SORRENTO SQUARE

Permit Reviews

Permit Number - DP14-0149
Permit Status: Complete
Permit Description: DP- SORRENTO SQUARE
Start Date Submittal Complete Date Status  
01/05/2015 DEV PKG - RESUBMITTAL 01/12/2015 COMPLETED Review Details
09/03/2014 DEV PKG - OK TO SUBMIT 09/04/2014 COMPLETED Review Details
09/04/2014 DEV PKG 11/20/2014 COMPLETED Review Details
11/20/2014 DEV PKG - RESUBMITTAL 01/05/2015 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP14-0149
Permit Status: Complete
Permit Description: DP- SORRENTO SQUARE
Total Outstanding Activity Conditions - 1
Date Name
01/05/2015 The following 11 conditions apply to permits DP14-0149:1)Call for Pre-construction meeting. For a City of Tucson Planning & Development Services Department (PDSD) Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department - Angie 837-4917, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)PDSD Inspector shall be called to inspect special grading/drainage improvements, such as drainage systems and protective infrastructure when under construction. 3)Copy of approved plan/permit DP14-0149 shall be kept at site at all times until final grading approval. These plans act as the approved grading plan for PPP NE Pads at Sorrento Square sealed by Jeffrey P Hunt P.E. on 12.29.2014.4)There shall be no disturbance outside of disturbance/grading limits as shown on approved grading and SWPPP plans. 5)Any downstream drainage facilities shall be completed, per previously approved Sorrento Square Rezoning conditions or other approved plans, before CofO is issued so that downstream drainage functions as intended and there are no adverse impacts to downstream property owners.6)Contact Permits & Codes (837-6606) for questions regarding City of Tucson right-of-way permit requirements. 7)Temporary erosion and sediment control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering streets or any drainage ways. Any interim erosion and sediment controls that are installed should be maintained, per approved SWPPP plans or Operator with consultation with EOR and Inspector as needed, at downstream areas of disturbance limits. These interim controls must be removed after all permanent controls have been established.8)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.9)Revisions to the design must be discussed with a Civil Engineer at PDSD Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. 10)Permittee shall notify PDSD Inspector when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed. Any other exposed areas that are not reseeded shall be covered in gravel, unless other material is proposed, reviewed, and accepted by City of Tucson.11)Project Engineering completion letters, as well as Final Revised Grading Plan (as-builts) are required to be submitted prior to final Grading Inspection. Letter of certification from Engineer of Record for project substantial completion is required and submitted prior to final grading inspection. As-builts should include as-built elevations for finished drainage system inlets, outlet area, and other areas as deemed needed by surveyor, as well as sequence number(s) for any recorded easements not already provided.

Outstanding Inspections

Permit Status: Complete
Permit Number: DP14-0149
Permite Description: DP- SORRENTO SQUARE
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/13/2015 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) {Activity date: 05/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT, NO CONSTRUCTION}
07/11/2017 ENGR Grading Final N/A Re-inspection required {Activity date: 07/11/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTACTED THE DIVISION II CONSTRUCTION COMPANY AND ASKED WHAT IS HAPPENING ON THIS SITE WITH THIS PERMIT. THEY HAVE ADVISED ME THAT THE WORK IS NOT GOING TO BE DONE BY THEIR COMPANY AND IS TO BE PERFORMED BY OTHERS. THEY WILL BE WORKING ON THE CLOSING OF ALL PERMITS FOR THE SITE IN THE FUTURE.}

Documents

File Name Document Type  
001_COVER SHEET_1 OF 9.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES / REZONING CONDITIONS_2 OF 9.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 9.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / UTILITIES / NOTES_4 OF 9.TIF DEVELOPMENT PACKAGE VIEW
005_DETAILS_5 OF 9.TIF DEVELOPMENT PACKAGE VIEW
006_LANDSCAPE PLAN COVER_L1.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_L2.TIF DEVELOPMENT PACKAGE VIEW
008_IRRIGATION_L3.TIF DEVELOPMENT PACKAGE VIEW
009_SWPPP_9 OF 9.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW