Permit: DP14-0129
Permit Details
Status:
Complete
Type:
Development Package
Address:
728 S CAMPBELL AV
Address NEW:
728 S CAMPBELL AV
Apply Date:
07/24/2014
Applicant:
Description:
SITE/GRADING - BESTWAY ELECTRIC
Permit Reviews
Permit Number - DP14-0129
Permit Status: Complete
Permit Description: SITE/GRADING - BESTWAY ELECTRIC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2014 | DEV PKG - OK TO SUBMIT | 07/24/2014 | COMPLETED |
| 07/24/2014 | SITE and/or GRADING | 08/26/2014 | COMPLETED |
| 09/05/2014 | RESUB - SITE and/or GRADING | 09/08/2014 | COMPLETED |
| 09/05/2014 | RESUB - SITE and/or GRADING | 10/07/2014 | COMPLETED |
| 10/07/2014 | RESUB - SITE and/or GRADING | 10/08/2014 | ACTIVE |
| 10/07/2014 | SITE and/or GRADING | 10/07/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0129
Permit Description: SITE/GRADING - BESTWAY ELECTRIC
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/06/2015; Status: Approved; Inspector: RLEDONN1; Comment: Entered by CSHARRA1 - MET W/ G.C. & GRADING CONTRACTOR} ; {Activity date: 02/09/2015; Status: Approved; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - } | |
| 06/26/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/26/2015 | ENGR Grading Final | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/05/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH GC .CHECKED RAMPS ON SOUTH SIDE OF BUILDING.} | |
| 06/26/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/26/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 07/10/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/10/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 07/20/2015 | ENGR Engineering Final | Passed | {Activity date: 07/20/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/26/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE STABILIZATION FOR DIRT LOT TO THE SOUTH WEST SIDE OF BUILDING. INSTALL GATE ON NORTH SIDE OF BUILDING PER AP PLANS. PROVIDE AS-BUILDING AND CERT LETTER.} |