Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
07/18/2014
Applicant:
Description:
TENTATIVE PLAT ADDENDUM - LA ESTANCIA DE TUCSON LOTS 1-664

Permit Reviews

Permit Number - DP14-0126
Permit Status: Complete
Permit Description: TENTATIVE PLAT ADDENDUM - LA ESTANCIA DE TUCSON LOTS 1-664
Start Date Submittal Complete Date Status  
05/15/2015 DEV PKG - RESUBMITTAL 06/19/2015 COMPLETED Review Details
06/26/2015 DEV PKG - RESUBMITTAL 06/29/2015 COMPLETED Review Details
06/29/2015 DEV PKG - RESUBMITTAL 08/26/2015 COMPLETED Review Details
07/18/2014 DEV PKG - OK TO SUBMIT 07/18/2014 COMPLETED Review Details
07/28/2014 DEV PKG 09/02/2014 COMPLETED Review Details
10/14/2014 DEV PKG - RESUBMITTAL 05/15/2015 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP14-0126
Permite Description: TENTATIVE PLAT ADDENDUM - LA ESTANCIA DE TUCSON LOTS 1-664
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/01/2017 ENGR Grading Final N/A Re-inspection required {Activity date: 01/27/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE REPRESENTATIVES FROM BORDERLAND / RICK AND LOOKED OVER THE AREA THAT THEY HAVE BEEN TRYING TO GET APPROVED FOR A FUTURE POUR. THEY ARE LOOKING AT A LOCAL DRAINAGE SWALE BETWEEN TO OF THE LOTS IN THE WESTERN SIDE OF THE SUBDIVISION. HE SHOWED ME PLAN SHEETS FROM AN ENGINEER THAT THEY ARE WANTING TO US, BUT NONE OF THESE SHEETS HAVE ANY STAMPS FOR APPROVAL FROM THE CITY OF TUCSON. THE ORIGINAL TENATIVE PLAT FOR THIS SITE IS NOT AVAILABLE AT THIS TIME, SO WE HAVE AGREED TO MEET DURING THE FIRST OF NEXT WEEK WITH ALL OF THE PLANS AND MAKE A DETERMINATION ON HOW TO PROCEED. I HAVE ASKED THAT THEY START SCHEDULING INSPECTIONS FOR THIS SITE OFF OF THEIR DEVELOPMENT PACKAGE SO THAT WE CAN STAY ON TOP OF THIS PROJECT THROUGH THE REMAINING OF THE CONSTRUCTION.
I LOOKED AT THE CURRENT PLANS THAT WE HAVE FOR THIS SITE AND DO NOT FIND A DEVELOPMENT PACKAGE PLAN THAT WE CAN SCHEDULE SITE INSPECTIONS AGAINST. I WILL MEET WITH THE ENGINEERING AND ZONING REVIEWERS TO SEE WHAT WE NEED TO DO TO ENSURE THAT ALL OF THE INSPECTIONS ARE BEING PERFORMED AS THEY ARE REQUIRED.} ; {Activity date: 02/01/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH RICK FROM BORDERLAND THIS MORNING AND SHOWED HIM THE APPROVED PLANS THAT I HAD FOR THIS SITE. THE CHANNEL THAT THEY ARE LOOKING AT CONSTRUCTING IS NOT APPROVED BY THE CITY AND WILL NEED TO BE REVIEWED AND APPROVED BEFORE THEY CAN COMPLETE CONSTRUCTING IT. HE WILL ASK THE ENGINEER OF RECORD IF THERE IS AN APPROVED PLAN FROM THE CITY FOR THESE CHANGES, IF NOT THEY WILL EITHER SUBMIT THE PLAN OR CONSTRUCT IT PER THE APPROVED PLANS.}