Permit Reviews

Permit Number - DP14-0005
Permit Status: Complete
Permit Description: SITE/GRADING - GROUP HOME
Start Date Submittal Complete Date Status  
01/07/2014 DEV PKG - OK TO SUBMIT 02/03/2014 COMPLETED Review Details
01/07/2014 SITE and/or GRADING 02/05/2014 COMPLETED Review Details
06/26/2014 RESUB - SITE/GRADING ALL 08/28/2014 COMPLETED Review Details
07/24/2015 REVISION - SITE 07/31/2015 COMPLETED Review Details
08/28/2014 RESUB - SITE/GRADING ALL 09/25/2014 COMPLETED Review Details
09/25/2014 RESUB - SITE and/or GRADING 09/29/2014 COMPLETED Review Details
09/29/2014 RESUB - SITE and/or GRADING 10/03/2014 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP14-0005
Permit Status: Complete
Permit Description: SITE/GRADING - GROUP HOME
Total Outstanding Activity Conditions - 1
Date Name
07/10/2014 AN APPROVED FIRE SPRINKLER SYSTEM AND FIRE ALARM SYSTEM IS REQUIRED FOR THIS GROUP I OCCUPANCY. UTILITY PLANS WILL NEED TO INDICATE FIRE SPRINKLER UNDERGROUND

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0005
Permit Description: SITE/GRADING - GROUP HOME
Total Completed Inspections - 7
Date Description Inspector Results Comments
08/10/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/10/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/10/2015 ENGR Engineering Final Passed {Activity date: 08/10/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/10/2015 SITE - Stormwater Follow-up Passed {Activity date: 08/10/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/01/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, REMINDED THE CREWS TO WATCH THE DUST CONTROL AND TO PREVENT TRACKOUT ONTO MOUNTAIN.} ; {Activity date: 05/21/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, HAVE REMINDED THE CREWS TO MAINTAIN THERE SITE SO THAT WE DO NOT HAVE ANY TRACKOUT}
08/10/2015 ENGR Grading Final Passed {Activity date: 08/10/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/08/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE IS NOT READY AT THIS TIME FOR APPROVAL, BUT THERE MAY BE SOME CONFLICT WITH MOUNTAIN, NEW SIDEWALK, DRIVEWAYS, TRASH ENCLOSURES, AND EXISTING MAILBOXES.}
08/10/2015 SITE - Stormwater Final Inspection Passed {Activity date: 08/10/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/10/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 08/10/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/10/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/10/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_T-1.TIF DEVELOPMENT PACKAGE VIEW
002_SITE DETAILS_T-1.1.TIF DEVELOPMENT PACKAGE VIEW
003_LANDSCAPE_L-1.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING_G-1.TIF DEVELOPMENT PACKAGE VIEW
005_BUILDING ELEVATIONS_A4.TIF DEVELOPMENT PACKAGE VIEW
006_BUILDING ELEVATIONS_A4.1.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW