Permit: DP13-0246
Permit Details
Apply Date:
12/12/2013
Applicant:
Timothy Robertson
Description:
GRADING
Permit Reviews
Permit Number - DP13-0246
Permit Status: Complete
Permit Description: GRADING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/02/2014 | GRADING | 01/29/2014 | COMPLETED |
01/30/2014 | RESUB - SITE and/or GRADING | 02/23/2015 | COMPLETED |
02/23/2015 | REVISION - GRADING | 02/23/2015 | COMPLETED |
12/12/2013 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 01/02/2014 | COMPLETED |
Conditions
Permit Number - DP13-0246
Permit Status: Complete
Permit Description: GRADING
Date | Description | Comments |
---|---|---|
01/30/2014 | GRADING PERMIT CONDITIONS:The following 12 conditions apply to this grading permit DP13-0246:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department - Angie 837-4917, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Copy of approved plan/permit DP13-0246 shall be kept at site at all times until final grading approval.3)These sets of plans act as the approved final grading plans for Wildcat Pass Lot 49 custom grading per approved plans sealed by Tim Robertson, R.A. 4)There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. Disturbance outside these limits may result in Stop Work Order, fines, and / or require revised plan submittal & review. Temporary fencing is required at southeast and northeast disturbance limits.5)PDSD Inspector should inspect special grading such as temporary fencing, and cut / fill slopes when under construction. 6)Geotechnical Engineer shall inspect constructed cut slopes that exceed 2:1(H:V) on site and provide certification letter of conformance to geotechnical report or requirements.7)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 8)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.9)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 10)Permittee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in gravel or hand placed rip rap, unless other material is proposed, reviewed, and accepted by City of Tucson.11)Temporary erosion and sediment control devices may be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering streets or any drainage ways. Any interim erosion and sediment controls that are installed should be maintained, per approved grading plans or per EOR, at downstream areas of disturbance limits.12)Project Engineering completion letters, as well as As-Builts are required to be submitted prior to final Grading Inspection. Letter of certification from Geotechnical Engineer of Record for project substantial completion is required and submitted prior to final grading inspection. As-builts should include as-built elevations for finished pad grades, front of driveway at street elevation, and other areas as deemed needed by surveyor. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0246
Permit Description: GRADING
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/13/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/22/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/22/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/21/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
02/23/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/23/2015; Status: Approved; Inspector: eleibol1; Comment: Entered by ARUIZ1 - } | |
02/23/2015 | ENGR Engineering Final | Passed | {Activity date: 02/23/2015; Status: Approved; Inspector: eleibol1; Comment: Entered by ARUIZ1 - } | |
02/23/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/23/2015; Status: Approved; Inspector: elieibol1; Comment: Entered by ARUIZ1 - } | |
02/23/2015 | ENGR Grading Final | Passed | {Activity date: 02/23/2015; Status: Approved; Inspector: eleibol1; Comment: Entered by ARUIZ1 - } | |
02/23/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 02/23/2015; Status: Approved; Inspector: elieibol1; Comment: Entered by ARUIZ1 - } |