Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9017 E OLD VAIL RD
Apply Date:
09/06/2013
Applicant:
Description:
SITE, GRADING, SWPPP

Permit Reviews

Permit Number - DP13-0174
Permit Status: Complete
Permit Description: SITE, GRADING, SWPPP
Start Date Submittal Complete Date Status  
01/07/2014 RESUB - SITE and/or GRADING 01/08/2014 ACTIVE Review Details
09/06/2013 DEV PKG - OK TO SUBMIT 09/06/2013 COMPLETED Review Details
09/06/2013 SITE and/or GRADING 10/30/2013 COMPLETED Review Details
11/06/2013 RESUB - SITE/GRADING ALL 12/10/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0174
Permit Description: SITE, GRADING, SWPPP
Total Completed Inspections - 7
Date Description Inspector Results Comments
04/10/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 04/10/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SPECIFICS (AT LOW POINTS)
2) A STABILIZE CONSTRUCTION ENTRANCE HAS BEEN INSTALLED SWEEP TRACKING AS NEEDED.
3) A CONCRETE / MATERIALS WASH OUT HAS BEEN INSTALLED.
4) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
5) A COPY OF YOUR NOI HAS BEEN POSTED
6) NPPO PLAN HAS BEEN FOLLOWED - REPLANT AS SHOWN ON THE APPROVED LANDSCAPE PLAN}
04/10/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/10/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SPECIFICS (AT LOW POINTS)
2) A STABILIZE CONSTRUCTION ENTRANCE HAS BEEN INSTALLED SWEEP TRACKING AS NEEDED.
3) A CONCRETE / MATERIALS WASH OUT HAS BEEN INSTALLED.
4) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
5) A COPY OF YOUR NOI HAS BEEN POSTED
6) NPPO PLAN HAS BEEN FOLLOWED - REPLANT AS SHOWN ON THE APPROVED LANDSCAPE PLAN}
05/12/2014 SITE - Stormwater Follow-up Passed {Activity date: 05/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF SITE HAS BEEN STABILIZED, ENSURE A (NOTICE OF TERMINATION) IS FILED WITH ADEQ.} ; {Activity date: 05/01/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/24/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME}
05/28/2014 SITE - Stormwater Final Inspection Passed {Activity date: 05/28/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU FILE A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 05/12/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF SITE HAS BEEN STABILIZED, ENSURE A (NOTICE OF TERMINATION) IS FILED WITH ADEQ.}
06/17/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/17/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/17/2014 ENGR Engineering Final Passed {Activity date: 06/17/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - APPROVED PER LAUREN MAKUS ( ENGINEERING REVIEWER).} ; {Activity date: 06/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO FINAL INSPECTION CALLED IN. SITE APPEARS TO BE COMPLETED AND PEOPLE ARE USING THE LOT.} ; {Activity date: 05/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE AN APPROVED PLAN THAT SHOWS WHAT WAS BUILT, FOR FINAL GRADING INSPECTION OR BUILD THE SITE PER THE ORIGINAL APPROVED PLANS.
2) CALL FOR FINAL GRADING INSPECTION} ; {Activity date: 05/12/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL, PROVIDE AN APPROVED PLAN SHOWING CHANGES MADE TO ORIGINAL GRADING/SITE PLAN.}
06/17/2014 ENGR Grading Final Passed {Activity date: 06/17/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - APPROVED PER LAUREN MAKUS} ; {Activity date: 05/12/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL, PROVIDE AN APPROVED PLAN SHOWING CHANGES MADE TO ORIGINAL GRADING/SITE PLAN.}

Documents

File Name Document Type  
001_COVER SHEET / NOTES_C1.TIF DOCUMENTS VIEW
002_SITE / GRADING_C2.TIF DOCUMENTS VIEW
003_HORIZONTAL CONTROL_C3.TIF DOCUMENTS VIEW
004_DETAILS_C4.TIF DOCUMENTS VIEW
005_NPPP_L-1.TIF DOCUMENTS VIEW
006_LANDSCAPE_L-2.TIF DOCUMENTS VIEW
007_IRRIGATION_L-3.TIF DOCUMENTS VIEW
008_WATER HARVESTING_L-4.TIF DOCUMENTS VIEW
009_CONSTRUCTION DETAILS_L-5.TIF DOCUMENTS VIEW
010_ELECTRICAL SITE_E1.TIF DOCUMENTS VIEW
011_ELECTRICAL DETAILS_E2.TIF DOCUMENTS VIEW
012_ELECTRICAL DETAILS_E3.TIF DOCUMENTS VIEW
013_ELECTRICAL SPECIFICATIONS_E4.TIF DOCUMENTS VIEW
PERMIT DOCUMENTS DOCUMENTS VIEW