Permit: DP13-0166
Permit Details
Apply Date:
08/27/2013
Applicant:
Description:
SITE/GRADING
Permit Reviews
Permit Number - DP13-0166
Permit Status: Complete
Permit Description: SITE/GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2014 | REVISION - - 1ST | 02/24/2014 | COMPLETED |
| 08/24/2015 | REVISION - GRADING | 09/24/2015 | COMPLETED |
| 08/26/2015 | SITE and/or GRADING | 08/26/2015 | COMPLETED |
| 08/27/2013 | DEV PKG - OK TO SUBMIT | 08/27/2013 | COMPLETED |
| 08/27/2013 | SITE and/or GRADING | 12/03/2013 | COMPLETED |
| 09/24/2015 | REVISION - GRADING | 09/28/2015 | COMPLETED |
| 09/28/2015 | REVISION - GRADING | 11/12/2015 | COMPLETED |
| 11/21/2013 | RESUB - SITE and/or GRADING | 12/03/2013 | COMPLETED |
| 12/03/2013 | RESUB - SITE/GRADING ALL | 12/03/2013 | COMPLETED |
| 12/03/2013 | RESUB - SITE/GRADING ALL | 01/23/2014 | COMPLETED |
Conditions
Permit Number - DP13-0166
Permit Status: Complete
Permit Description: SITE/GRADING
| Date | Description | Comments |
|---|---|---|
| 12/03/2013 | At least one curb opening from the parking area to the landscape area must be provided within 20 feet of the driveway to Santa Maria Street. The opening must also be shown on a revised grading DP before the project is complete. | |
| 12/03/2013 | A complete drainage report meeting the format requirements of the the Drainage Manual must be submitted and approved before the final grading inspection is approved. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0166
Permit Description: SITE/GRADING
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/10/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO SWPPP PLAN NEEDED PER LOREN MAKUS.} ; {Activity date: 07/09/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/05/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET NOTES FROM 1-28-2014} ; {Activity date: 01/28/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE APPROVED SWPPP PLAN AND NOI FOR THIS ACTIVITY.} ; {Activity date: 01/27/2014; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CHECKING FOR SWPPP FOR SITE} | |
| 11/26/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/26/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/25/2001; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE WILL BE INSPECTED BY RON LE DONNE WHEN HE RETURNS ON 9/30/2014} | |
| 11/26/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/26/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/23/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/23/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/25/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/26/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 07/23/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/23/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 11/19/2015 | ENGR Engineering Final | Passed | {Activity date: 11/19/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/23/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET NOTES FROM LAST INSPECTION.} ; {Activity date: 06/23/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE AS-BUILTS FOR ALL CHANGES TO GRADING AND DRAINAGE.} ; {Activity date: 11/26/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/25/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE WILL BE INSPECTED BY RON LE DONNE WHEN HE RETURNS ON 9/30/2014} | |
| 11/19/2015 | ENGR Grading Final | Passed | {Activity date: 11/19/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/23/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - AS-BUILTS NEEDED PER LOREN MAKUS.} ; {Activity date: 07/23/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/23/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |