Permit: DP13-0134
Permit Details
Status:
Complete
Type:
Development Package
Address:
5150 N GRACIOUS CT
Address NEW:
5150 N GRACIOUS CT
Apply Date:
07/18/2013
Applicant:
Description:
GRADING
Permit Reviews
Permit Number - DP13-0134
Permit Status: Complete
Permit Description: GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2015 | REVISION - GRADING | 06/26/2015 | ACTIVE |
| 07/18/2013 | GRADING | 07/31/2013 | COMPLETED |
Conditions
Permit Number - DP13-0134
Permit Status: Complete
Permit Description: GRADING
| Date | Description | Comments |
|---|---|---|
| 07/29/2013 | NO disturbance outside of grading limits. Revised grading plan or SWPPP may apply. Call for grading inspections at SWPP installation and also at final grading. | |
| 07/29/2013 | Slope easement along Gracious Court frontage is considered publicly maintained. | |
| 07/29/2013 | All temporary interim controls shall be removed and permanent controls placed prior to final grading approval. If lot remains undisturbed and no building permit is obtained or active, the City may require revegetation or gravel be placed on disturbed areas. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0134
Permit Description: GRADING
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2013 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT: 1) ENSURE SAGUARO'S ON SITE ARE PRESERVED IN PLACE OR TRANSPLANTED OUTSIDE OF DISTURBANCE 2) PROTECT OR TRANSPLANT ANY OTHER PROTECTED SPECIES OF PLANT ON SITE DURING CONSTRUCTION 3) SITE DISTURBANCE IS LESS THAN 1 ACRE, SITE NOT REQUIRED TO HAVE A STORM WATER PERMIT 4) INSTALL SEDIMENT CONTROLS PER PLAN 5) ENSURE CONDITIONS ON THE GRADING PERMIT ARE FOLLOWED} |
|
| 08/27/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT: 1) ENSURE SAGUARO'S ON SITE ARE PRESERVED IN PLACE OR TRANSPLANTED OUTSIDE OF DISTURBANCE 2) PROTECT OR TRANSPLANT ANY OTHER PROTECTED SPECIES OF PLANT ON SITE DURING CONSTRUCTION 3) SITE DISTURBANCE IS LESS THAN 1 ACRE, SITE NOT REQUIRED TO HAVE A STORM WATER PERMIT 4) INSTALL SEDIMENT CONTROLS PER PLAN 5) ENSURE CONDITIONS ON THE GRADING PERMIT ARE FOLLOWED} |
|
| 09/17/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED 2) NPPO APPROVED 3) MAINTAIN STORM WATER CONTROLS THROUGHOUT CONSTRUCTION} |
|
| 10/29/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/29/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE A NOTICE OF TERMINATION IS FILED WITH ADEQ} ; {Activity date: 06/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/24/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE/STORM WATER CHANGES OR CONCERNS AT THIS TIME} ; {Activity date: 03/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} | |
| 12/12/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/13/2014; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY} | |
| 12/12/2014 | ENGR Engineering Final | Passed | {Activity date: 12/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE SITE GRADING PER THE APPROVED PLANS} | |
| 12/12/2014 | ENGR Grading Final | Passed | {Activity date: 12/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 05/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS} ; {Activity date: 05/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/24/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE/STORM WATER CHANGES OR CONCERNS AT THIS TIME} ; {Activity date: 03/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES ANR/OR CONCERNS AT THIS TIME} ; {Activity date: 02/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE SITE/GRADING WORK MATCH THE APPROVED PLANS} ; {Activity date: 12/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS TIME} ; {Activity date: 10/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES OR CONCERNS AT THIS TIME} | |
| 12/12/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/25/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STABILIZE THE DISTURBED AREA, CALL FOR RE-INSPECTION} |