Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
5101 N GRACIOUS CT
Apply Date:
07/18/2013
Applicant:
Description:
GRADING

Permit Reviews

Permit Number - DP13-0133
Permit Status: Complete
Permit Description: GRADING
Start Date Submittal Complete Date Status  
07/18/2013 GRADING 07/31/2013 COMPLETED Review Details
09/04/2013 REVISION - GRADING 09/04/2013 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP13-0133
Permit Status: Complete
Permit Description: GRADING
Total Outstanding Activity Conditions - 4
Date Name
07/29/2013 SWPPP controls at disturbance limits shall include septic field if not revegetated or if rock has not been applied.
07/29/2013 Per Revision 4SEP13, 18-IN CMP pipe at driveway crossing with rip rap and filter fabric.
07/29/2013 NO disturbance outside of grading limits. Revised grading plan or SWPPP may apply.
07/29/2013 Call for grading inspections at SWPP installation, driveway construction, west slope construction, and at final grading.

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0133
Permit Description: GRADING
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/27/2013 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT:

1) ENSURE SAGUARO'S ON SITE ARE PRESERVED IN PLACE OR TRANSPLANTED OUTSIDE OF DISTURBANCE
2) PROTECT OR TRANSPLANT ANY OTHER PROTECTED SPECIES OF PLANT ON SITE DURING CONSTRUCTION
3) SITE DISTURBANCE IS LESS THAN 1 ACRE, SITE NOT REQUIRED TO HAVE A STORM WATER PERMIT
4) INSTALL SEDIMENT CONTROLS PER PLAN
5) ENSURE CONDITIONS ON THE GRADING PERMIT ARE FOLLOWED}
08/27/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT:

1) ENSURE SAGUARO'S ON SITE ARE PRESERVED IN PLACE OR TRANSPLANTED OUTSIDE OF DISTURBANCE
2) PROTECT OR TRANSPLANT ANY OTHER PROTECTED SPECIES OF PLANT ON SITE DURING CONSTRUCTION
3) SITE DISTURBANCE IS LESS THAN 1 ACRE, SITE NOT REQUIRED TO HAVE A STORM WATER PERMIT
4) INSTALL SEDIMENT CONTROLS PER PLAN
5) ENSURE CONDITIONS ON THE GRADING PERMIT ARE FOLLOWED,(20-LF PC/COT stnd/dtl 203 concrete header to be set at both sides of driveway at dip crossing (per EOR letter in submittal pkg).}
09/17/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 09/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STORM WATER CONTROLS IN PLACE
2) NPPO APPROVED.
3) REVISED PLAN CHANGED THE DRIVEWAY TO ADD A CULVERT FOR DRAINAGE.}
01/22/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/22/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NPPO OK}
01/22/2014 ENGR Engineering Final Passed {Activity date: 01/22/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ALL SITE/GRADING WAS COMPLETED PER THE APPROVED/REVISED PLAN}
01/22/2014 SITE - Stormwater Follow-up Passed {Activity date: 01/22/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/13/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIEMNT CONTROLS IN PLACE, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
01/22/2014 SITE - Stormwater Final Inspection Passed {Activity date: 01/22/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/28/2014 RSBU - Building Final Passed {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - }
04/24/2015 ENGR Grading Final Passed {Activity date: 04/24/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_1 OF 2.TIF GRADING PLANS VIEW
002_2 OF 2.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW