Permit: DP13-0132
Permit Details
Status:
Complete
Type:
Development Package
Address:
5140 N GRACIOUS CT
Address NEW:
5140 N GRACIOUS CT
Apply Date:
07/18/2013
Applicant:
Description:
GRADING
Permit Reviews
Permit Number - DP13-0132
Permit Status: Complete
Permit Description: GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/18/2013 | GRADING | 07/31/2013 | COMPLETED |
Conditions
Permit Number - DP13-0132
Permit Status: Complete
Permit Description: GRADING
| Date | Description | Comments |
|---|---|---|
| 07/29/2013 | Along frontage of Gracious Court, the slope easement is considered publicly maintained. | |
| 07/29/2013 | SWPPP controls at disturbance limits shall include septic field if not revegetated or if rock has not been applied. | |
| 07/29/2013 | NO disturbance outside of grading limits. Revised grading plan or SWPPP may apply. Call for grading inspections at SWPP installation, driveway construction, west slope construction, and at final grading. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0132
Permit Description: GRADING
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2013 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT: 1) ENSURE SAGUARO'S ON SITE ARE PRESERVED IN PLACE OR TRANSPLANTED OUTSIDE OF DISTURBANCE 2) PROTECT OR TRANSPLANT ANY OTHER PROTECTED SPECIES OF PLANT ON SITE DURING CONSTRUCTION 3) SITE DISTURBANCE IS LESS THAN 1 ACRE, SITE NOT REQUIRED TO HAVE A STORM WATER PERMIT 4) INSTALL SEDIMENT CONTROLS PER PLAN 5) ENSURE CONDITIONS ON THE GRADING PERMIT ARE FOLLOWED} |
|
| 08/27/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT: 1) ENSURE SAGUARO'S ON SITE ARE PRESERVED IN PLACE OR TRANSPLANTED OUTSIDE OF DISTURBANCE 2) PROTECT OR TRANSPLANT ANY OTHER PROTECTED SPECIES OF PLANT ON SITE DURING CONSTRUCTION 3) SITE DISTURBANCE IS LESS THAN 1 ACRE, SITE NOT REQUIRED TO HAVE A STORM WATER PERMIT 4) INSTALL SEDIMENT CONTROLS PER PLAN 5) ENSURE CONDITIONS ON THE GRADING PERMIT ARE FOLLOWED} |
|
| 09/17/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE 2) ENSURE STROM WATER CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION 3) NPPO APPROVED} |
|
| 03/26/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 03/26/2014 | ENGR Engineering Final | Passed | {Activity date: 03/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LOT ACCESS COMPLETION WILL BE ADDRESSED UNDER THE GRADING PERMIT FOR LOT#14} ; {Activity date: 02/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL DRAINAGE SWALE SHOWN ON APPROVED PLAN 2) INSTALL DRIVEWAY ACCESS SHOWN ON APPROVED PLAN CALL FOR RE-INSPECTION} |
|
| 03/26/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORMWATER COCERNS AT THIS TIME} ; {Activity date: 12/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO STORMWATER CONCERNS AT THIS TIME. 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) NO CHANGES OR CONCERNS WITH SITE WORK AT THIS TIME} ; {Activity date: 11/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} |
|
| 03/26/2014 | ENGR Grading Final | Passed | {Activity date: 03/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS} ; {Activity date: 02/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE ANY REVISIONS ARE SHOWN ON THE APPROVED PLANS} ; {Activity date: 12/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO STORMWATER CONCERNS AT THIS TIME. 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) NO CHANGES OR CONCERNS WITH SITE WORK AT THIS TIME} ; {Activity date: 11/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 10/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} |
|
| 03/26/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ALL STORM WATER CONCERNS WILL BE ADDRESSED UNDER THE GRADING PERMIT FOR LOT#14} |