Permit Details

Status:
Complete
Type:
Development Package
Address:
2550 E WATER ST
Address NEW:
2550 E WATER ST
Apply Date:
05/10/2013
Applicant:
Description:
SITE/GRADING

Permit Reviews

Permit Number - DP13-0080
Permit Status: Complete
Permit Description: SITE/GRADING
Start Date Submittal Complete Date Status  
05/10/2013 DEV PKG - OK TO SUBMIT 05/10/2013 COMPLETED Review Details
05/10/2013 SITE and/or GRADING 06/06/2013 COMPLETED Review Details
06/06/2013 RESUB - SITE/GRADING ALL 06/07/2013 COMPLETED Review Details
09/13/2013 REVISION - SITE 09/20/2013 COMPLETED Review Details
09/20/2013 REVISION - SITE 10/08/2013 COMPLETED Review Details
10/10/2013 RESUB - SITE and/or GRADING 10/14/2013 COMPLETED Review Details
12/09/2013 REVISION - SITE 12/19/2013 COMPLETED Review Details
12/19/2013 RESUB - SITE and/or GRADING 09/01/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0080
Permit Description: SITE/GRADING
Total Completed Inspections - 7
Date Description Inspector Results Comments
06/25/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/25/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR CONSTRUCTING 9 UNITS ON A SITE THAT IS 0.9 ACRES. SITE HAS BLDG PERMITS FOR EACH BLDG HOWEVER ENG, LANDSCAPE, NPPO, AND SIGN IS NOT ON ANY OF THE PERMITS AS AN INSPECTION. FIVE OF THE UNITS ARE OCCUPIED AND HAVE NOT BEEN INSPECTED BY ENGINEERING.

1) CONTRACTOR INSTALLED SEDIMENT CONTROLS FOR PHASE TWO (REMAINING 4 UNITS)
2) NO SWPPP REQ SITE IS < 1ACRE
3) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS DURING CONSTRUCTION
4) USE A CONCRETE WASH OUT ON SITE
5) CALL FOR INSPECTION FOR ANY CONCERNS OR PROBLEMS WITH THE SITE
}
09/07/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/07/2021; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - Originally approved on DP11-0005.}
09/07/2021 ENGR Engineering Final Passed {Activity date: 09/07/2021; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - Originally approved on DP11-0005.} ; {Activity date: 06/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR CONSTRUCTING 9 UNITS ON A SITE THAT IS 0.9 ACRES. SITE HAS BLDG PERMITS FOR EACH BLDG HOWEVER ENG, LANDSCAPE, NPPO, AND SIGN IS NOT ON ANY OF THE PERMITS AS AN INSPECTION. FIVE OF THE UNITS ARE OCCUPIED AND HAVE NOT BEEN INSPECTED BY ENGINEERING.

1) CONTRACTOR INSTALLED SEDIMENT CONTROLS FOR PHASE TWO (REMAINING 4 UNITS)
2) NO SWPPP REQ SITE IS < 1ACRE
3) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS DURING CONSTRUCTION
4) USE A CONCRETE WASH OUT ON SITE
5) CALL FOR INSPECTION FOR ANY CONCERNS OR PROBLEMS WITH THE SITE
}
09/07/2021 SITE - Stormwater Follow-up Passed {Activity date: 09/07/2021; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - Originally approved on DP11-0005.}
09/07/2021 ENGR Grading Final Passed {Activity date: 09/07/2021; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - } ; {Activity date: 08/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /SIDEWALK NON-COMPLIANT.}
09/07/2021 SITE - Stormwater Final Inspection Passed {Activity date: 09/07/2021; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - Originally approved on DP11-0005.}
09/07/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 09/07/2021; Status: Approved; Inspector: LMakus; Comment: Entered by LMAKUS1 - Originally approved on DP11-0005.} ; {Activity date: 06/25/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR CONSTRUCTING 9 UNITS ON A SITE THAT IS 0.9 ACRES. SITE HAS BLDG PERMITS FOR EACH BLDG HOWEVER ENG, LANDSCAPE, NPPO, AND SIGN IS NOT ON ANY OF THE PERMITS AS AN INSPECTION. FIVE OF THE UNITS ARE OCCUPIED AND HAVE NOT BEEN INSPECTED BY ENGINEERING.

1) CONTRACTOR INSTALLED SEDIMENT CONTROLS FOR PHASE TWO (REMAINING 4 UNITS)
2) NO SWPPP REQ SITE IS < 1ACRE
3) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS DURING CONSTRUCTION
4) USE A CONCRETE WASH OUT ON SITE
5) CALL FOR INSPECTION FOR ANY CONCERNS OR PROBLEMS WITH THE SITE
}

Documents

File Name Document Type  
001_SITE/TITLE/PROJECT INFORMATION_C-1.TIF DOCUMENTS VIEW
002_GRADING_C-2.TIF DOCUMENTS VIEW
003_SITE/UTILITIES/WATER/SEWER_C-3.TIF DOCUMENTS VIEW
004_LANDSCAPE_L-1.TIF DOCUMENTS VIEW
005_IRRIGATION_L-2.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW