Permit Details

Status:
Complete
Type:
Development Package
Address:
2460 N DODGE BL
Address NEW:
2460 N DODGE BL
Apply Date:
12/13/2011
Applicant:
Description:
CPSA Parking Lot Expansion

Permit Reviews

Permit Number - DP11-0020
Permit Status: Complete
Permit Description: CPSA Parking Lot Expansion
Start Date Submittal Complete Date Status  
01/13/2012 RESUBMITTAL - SITE ALL 01/20/2012 COMPLETED Review Details
01/20/2012 RESUBMITTAL - SITE ALL 02/01/2012 COMPLETED Review Details
02/01/2012 REVISION - - 1ST 02/28/2012 COMPLETED Review Details
02/28/2012 REVISION - - 1ST 03/06/2012 COMPLETED Review Details
12/13/2011 DEV PKG - OK TO SUBMIT (SITE) 12/13/2011 COMPLETED Review Details
12/13/2011 SITE 01/05/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP11-0020
Permit Description: CPSA Parking Lot Expansion
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/30/2012 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/30/2012; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - APPEARS TO BE NO CONCERN FOR THE DRAINAGE ON THIS SITE.}
05/08/2012 ENGR Grading Final Passed {Activity date: 05/08/2012; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
06/11/2012 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/11/2012; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/08/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - FINAL INSPECTION TO BE COMPLETED ONCE ALL OF THE PLANTS HAVE BEEN INSTALLED AND ALL OF THE WORK IS COMPLETED.}
06/11/2012 ENGR Engineering Final Passed {Activity date: 06/11/2012; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/08/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - FINAL NOT TO BE GIVEN TILL ALL OF THE INFORMATION HAS BEEN PROVIDED. A CERTIFICATION LETTER HAS BEEN GIVEN BUT WE STILL NEED THE APPROVED AS-BUILT DRAWINGS FOR THIS SITE TO PERFORM THE FINAL INSPECTION.}
07/10/2012 RSBU - Building Final Passed {Activity date: 07/10/2012; Status: Approved; Inspector: DROBERTS; Comment: Entered by KMEDINA1 - }