Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP11-0018
Permit Details
Status:
Complete
Type:
Development Package
Address:
1900 E SPEEDWAY BL
Address NEW:
1900 E SPEEDWAY BL
Apply Date:
12/12/2011
Applicant:
Chuck Martin
Description:
ALOFT RENOVATION- SITE & GRADING
Permit Reviews
Permit Number - DP11-0018
Permit Status: Complete
Permit Description: ALOFT RENOVATION- SITE & GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2012 | RESUBMITTAL - SITE ALL | 04/02/2012 | COMPLETED |
| 04/26/2012 | RESUB - SITE and/or GRADING | 04/27/2012 | COMPLETED |
| 12/12/2011 | DEV PKG - OK TO SUBMIT (SITE) | 12/12/2011 | COMPLETED |
| 12/13/2011 | SITE | 01/04/2012 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP11-0018
Permit Description: ALOFT RENOVATION- SITE & GRADING
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 03/07/2013 | ENGR Engineering Final | Passed | {Activity date: 03/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE AND PARKING AREA DO NOT COMPLY WITH EXISTING DEVELOPMENT STANDARDS. 2) DUE TO THE FACT THAT THE CONTRACTOR IS NOT TASKED WITH CHANGING THE SITE OUTSIDE OF THE FOOTPRINT OF THE BLDG, THE NON-CONFORMING SITE WILL REMAIN IN PLACE. 3) PICTURES TAKEN OF THE NON-CONFORMING PARKING AREA AND PAAL'S} |
|
| 03/07/2013 | ENGR Grading Final | Passed | {Activity date: 03/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO WORK OUTSIDE THE FOOT PRINT OF THE BLDG} | |
| 03/07/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/11/2013; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO ENG PRE-CON CALLED IN. 2) NO SITE INSPECTIONS CALLED IN. 3) SITE HAS SWPPP, HOWEVER SWPP WAS NEVER IMPLEMENTED OR INSPECTED. SWPPP SAYS SITE DISTURBANCE IS 1.1 ACRES, NO NOI ON SITE. 4) PAAL WIDTH IS AS NARROW AS 14 FEET, HOWEVER TWO WAY TRAVEL IS SHOWN ON PLAN. 5) TRASH ENCLOSURE WIDTH ON APPROVED PLAN SHOWS 24'-8", ENCLOSURE WAS BUILT AT 21' 6) STORM DRAIN CATCH BASIN SHOWN ON APPROVED PLANS WAS NOT INSPECTED. 7) ALL PERMITS WITH ENGINEERING INSPECTIONS ON THEM INCLUDE: DP11-0018, T12CM00722, T12CM01919, AND DP12-0037 (ADJACENT PARKING). 8) NPPO WAS NEVER IMPLEMENTED 9) SITE PLAN SHOWS A 4' MIN SIDEWALK W/ A 2.5' VEHICLE OVERHANG, LEAVING A 1.5' PEDESTRIAN PATHWAY. ADA REQUIRES A MIN 36" CLEAR PATH FOR ACCESS.} |
|
| 03/06/2017 | RSBU - Building Final | Passed | {Activity date: 03/06/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |