Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/03/2011
Applicant:
Description:
QUIKTRIP STORE #1461

Permit Reviews

Permit Number - DP11-0003
Permit Status: Complete
Permit Description: QUIKTRIP STORE #1461
Start Date Submittal Complete Date Status  
02/13/2012 DEV PKG - RESUBMITTAL 03/29/2012 COMPLETED Review Details
03/29/2012 RESUB - SITE/GRADING ALL 04/13/2012 COMPLETED Review Details
11/03/2011 DEVELOPMENT PKG 12/22/2011 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP11-0003
Permit Description: QUIKTRIP STORE #1461
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/25/2012 SITE - Stormwater Setup and Controls Passed {Activity date: 05/25/2012; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/25/2012 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/25/2012; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/18/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - DROPED OFF PER-CON PACKET.}
09/11/2012 SITE - SWPPP Correction Notice Passed {Activity date: 09/11/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/29/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRACK OUT ON STREET. GOT WITH CONTRACTOR CONTROLS NEED TO ALL BE REPAIRED .STREETS NEED CLEANED . TRACK OUT ROCK NEEDS TO BE ADD.} ; {Activity date: 06/20/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH CONTRACTOR TO REPAIR SWPPP CONTROLS AND CLEAN TRACK OUT.} ; {Activity date: 05/16/2012; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COLLINS EXCAVATING HAS BEEN ADVISED TO CLEAN UP ANY AND ALL TRACK OUT FROM THIS SITE.}
09/20/2012 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/20/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/05/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF PLANT HAVE BEEN PLANTED.
IRRIGATION SYSTEM HAS BEEN INSTALLED.
STILL MISSING ROCK AND SOME GROUND COVER.}
09/20/2012 ENGR Engineering Final Passed {Activity date: 09/20/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR PROVIDED A GERT STATEMENT FROM THE ENG OF RECORD.
2) CONTRACTOR PROVIDED A COPY OF THE NOT
3) CONTRACTOR PROVIDED A CERT AS-BUILT}
09/20/2012 SITE - Stormwater Follow-up Passed {Activity date: 09/20/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/12/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1)DISCUSSED SIDEWALK SCUPPER AND HANDRAILING REQUIREMENT.
2) NO REQUREMENT FOR HANDRAILING IN FRONT OF WEIR AT SIDEWALK ALONG SOUTH ACCESS.
3) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/11/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE ALL STRIPING PER PLAN TO INCLUDE H.C. ACCESS AND PARKING.
2) COMPLETE ALL LANDSCAPING
3) INSTALL REMAINING SCUPPERS AND WEIR
4) INSTALL REMAINING BRICK
5) MISSING ONE PALO VERDE TREE ALONG ALVERNON
6) PROVIDE DRAINAGE CERTIFICATION FROM ENG OF RECORD AND CERTIFIED AS-BUILT.
7) SUBMIT A NOTICE OF TERMINATION TO ADEQ.} ; {Activity date: 09/05/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME.
APPROXIMATELY THREE WEEK S OUT.
STILL NEED BASIN CERT FROM EOR AND A CERT AS-BUILT} ; {Activity date: 08/29/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT ALL SITE WORK AND STORM WATER DRAINAGE WAS COMPLETED PER THE APPROVED PLAN.
2) PROVIDE A CERT. AS-BUILT DRAWING.
3) ENSURE H.C. ACCESS AND PARKING MEET ALL REQUIRED SLOPES.
4) ENSURE ALL LANDSCAPING IS COMPLETED PER THE APPROVED PLAN.
5) ENSURE A NOTICE OF TERMINATION (NOT) IS SUBMITTED TO ADEQ.
6) CLEAN OUT ALL CATCH BASINS PRIOR TO FINAL.
7) CLEAN OUT BASINS OF PAINT, CONCRETE, AND OTHER CONST. MATERIALS.} ; {Activity date: 08/22/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE APPROXIMATELY 80% PAVED.
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 08/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER AND/OR GRADING CONCERNS AT THIS TIME.} ; {Activity date: 08/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
2) REMOVE STOCKPILE OF SOIL AS SOON AS POSSIBLE.
3) PRIO TO FINAL GRADING APPROVAL, PROVIDE A CERT. STATEMENT FROM THE ENG OF RECORD AND A CERT. AS-BUILT PLAN.} ; {Activity date: 08/15/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME.
CONTRACTOR PAVING SITE.} ; {Activity date: 07/30/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) LOOK AT HIGH POINTS IN DRIVEWAYS AND STORMWATER SURFACE DRAINAGE.
2) REPAIR SECTIONS OF SILT FENCE THAT IS FALLING DOWN/DAMAGED.
3) ENSURE RUN SLOPES OF SIDEWALKS DON NOT EXCEED 5%/CROSS SLOPE NO GREATER THAN 2%.
4) RE-INSTALL YOUR CONCRETE WASH OUT ON SITE.} ; {Activity date: 07/18/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A STATEMENT FROM THE ENGINEER OF RECORD STATING THAT SUBGRADE STORM WATER DRAINAGE WAS CONSTRUCTED PER APPROVED PLAN.
2) NEED TO MAINTAIN SEDIMENT CONTROLS - RE-INSTALL/REPLACE SILT FENCE THATS DOWN ( E/SE AREA) .
3) PLACE SEDIMENT CONTROLS AROUND STOCKPILE AT SW CORNER OR REMOVE AS SOON AS POSSIBLE.
4) SWEEP TRACKED SOIL AS NEEDED
5) HAVE A DESIGNATED CONCRETE WASH OUT ON SITE.

CALL FOR RE-INSPEC FOR ANY CONCERNS AND/OR SITE PROBLEMS} ; {Activity date: 07/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WANTED TO GATHER INFORMATION ON SITE - LOOK AT APPROVED GRADING, STORM WATER, AND LANDSCAPE PLANS.
2) INSPECTION TO ENSURE SITE COMPLIANCE WITH YOUR STORM WATER PERMIT.
3) MAY NEED MAINTENANCE OF EXISTING SEDIMENT CONTROLS.
4) STOCK PILE OF SOIL HAS BEEN MOVED

NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
09/20/2012 SITE - Stormwater Final Inspection Passed {Activity date: 09/20/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/11/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE ALL STRIPING PER PLAN TO INCLUDE H.C. ACCESS AND PARKING.
2) COMPLETE ALL LANDSCAPING
3) INSTALL REMAINING SCUPPERS AND WEIR
4) INSTALL REMAINING BRICK
5) MISSING ONE PALO VERDE TREE ALONG ALVERNON
6) PROVIDE DRAINAGE CERTIFICATION FROM ENG OF RECORD AND CERTIFIED AS-BUILT.
7) SUBMIT A NOTICE OF TERMINATION TO ADEQ.}
04/19/2017 RSBU - Building Final Passed {Activity date: 04/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/05/2020 ENGR Grading Final Passed {Activity date: 08/05/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} ; {Activity date: 09/20/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/29/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/16/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ONSITE WIH COLLINS EXCAVATING AND DISCUSSED WHAT IS NEEDED SINCE THEY HAVE STARTED DOING THE WORK ON THIS SITE AT THIS TIME. HE WILL BE CALLING IN THE PRE-CON INSPECTIONS FOR THIS SITE AND FOR THE GRADING PERMIT SO THAT THEY CAN BE PERFORMED BY TOMORROW. THEY HAVE PLACED SILT FENCE ALONG THE PERIMETER OF THE SITE, AND THERE ARE MINOR SIGNS OF TRACKOUT NOTED ON THE ROADWAY TOWARDS ALVERNON ROAD. I WILL RE-INSPECT THIS SITE NEXT WEEK TO ENSURE THAT THEY HAVE SWEPT THE STREETS.}

Documents

File Name Document Type  
001_COVER SHEET_C001.TIF DEVPLANS VIEW
002_GENERAL NOTES_C002.TIF DEVPLANS VIEW
003_DEMO_C030.TIF DEVPLANS VIEW
004_SITE_C100.TIF DEVPLANS VIEW
005_GRADING_C110.TIF DEVPLANS VIEW
006_GRADING_C111.TIF DEVPLANS VIEW
007_DETAILED GRADING_C112.TIF DEVPLANS VIEW
008_ADA_C113.TIF DEVPLANS VIEW
009_STORM SEWER_C120.TIF DEVPLANS VIEW
010_PAVING_C130.TIF DEVPLANS VIEW
011_BUILDING PAVING_C131.TIF DEVPLANS VIEW
012_SWPPP COVER_C140.TIF DEVPLANS VIEW
013_SWPPP NOTES_C141.TIF DEVPLANS VIEW
014_SWPPP INSPECTION_C142.TIF DEVPLANS VIEW
015_EROSION CONTROL_C143.TIF DEVPLANS VIEW
016_EROSION CONTROL_C144.TIF DEVPLANS VIEW
017_UTILITY_C150.TIF DEVPLANS VIEW
018_MISC.SITE_C500.TIF DEVPLANS VIEW
019_MISC.SITE DETAILS_C501.TIF DEVPLANS VIEW
020_ADA DETAILS_C510.TIF DEVPLANS VIEW
021_ADA DETAILS_C511.TIF DEVPLANS VIEW
022_PAVING DETAILS_C520.TIF DEVPLANS VIEW
023_PAVING DETAILS_C521.TIF DEVPLANS VIEW
024_PAVING DETAILS_C522.TIF DEVPLANS VIEW
025_PAVING DETAILS_C523.TIF DEVPLANS VIEW
026_TRENCHING DETAILS_C530.TIF DEVPLANS VIEW
027_TRENCHING DETAILS_C531.TIF DEVPLANS VIEW
028_DRAINAGE DETAILS_C540.TIF DEVPLANS VIEW
029_EROSION CONTROL DETAILS_C570.TIF DEVPLANS VIEW
030_CITY DETAILS_C571.TIF DEVPLANS VIEW
031_CITY DETAILS_C572.TIF DEVPLANS VIEW
032_CITY DETAILS_C573.TIF DEVPLANS VIEW
033_LANDSCAPE COVER_L100.TIF DEVPLANS VIEW
034_PLANTING PLAN_L101.TIF DEVPLANS VIEW
035_RAINWATER HARVESTING_L102.TIF DEVPLANS VIEW
036_IRRIGATION_L110.TIF DEVPLANS VIEW
037_LANDSCAPE DETAILS_L500.TIF DEVPLANS VIEW
038_IRRIGATION DETAILS_L510.TIF DEVPLANS VIEW
039_IRRIGATION DETAILS_L511.TIF DEVPLANS VIEW
None DOCUMENTS VIEW
ADEQ.PDF DOCUMENTS VIEW
CERTIFICATION LETTER.PDF DOCUMENTS VIEW
BOND RELEASE LETTER 2013_5_24.PDF DOCUMENTS VIEW