Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Efectuat
Type:
Board of Adjustment
Apply Date:
01/07/2009
Applicant:
N/A
Description:
C10-03-18 CABEZON EQUESTRIAN CENTER BARN (T03CM02277) The applicant's property is 15.63 acre site developed as commercial stables. The demolition of non-conforming barns and reconstruction of a new barn requires that all LUC development criteria applicable to the new construction be met. The applicant is requesting a variance to allow the site's total lot coverage be increased, by the construction of the new barn, as indicated on the revised site plan for the property dated April 17, 2003. DECISION: VARIANCE 1: GRANTED WITH CONDITIONS. A. Variance not effectuated until use of the south adjacent property has been resolved in a manner acceptable to the City, which may include a requirement for the installation of a fence along the south lot line. B. Building Permits to be obtained for the new barn.