Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Efectuat
Type:
Board of Adjustment
Apply Date:
01/02/2009
Applicant:
N/A
Description:
SPLIT DECISION The applicant is appealing the Development Services Director's denial of Lot Development Option (LDO) Case LDO-02-197. Case LDO-02-197 is a request for Lot Development Options to : 1) Reduce the side yard setback requirement for the proposed enclosure of the existing front carport for living space and new porch from (9') to (1') as measured to the south lot line of the property; 2) to reduce the side yard setback requirement for the new ornamental tower proposed on top of the enclosed front carport (10') to (5') as measured to the south lot line of the property, and 3) to reduce the side yard setback requirement for the proposed new bedroom and porch addition to the rear of the dwelling from (9') to (7') as measured to the south lot line of the property, all as indicated on the site plan submitted for the project.
SPLIT DECISION: Uphold Denial of LDO #1 and #2. Reverse Denial of LDO #3.
Documents
| File Name |
Document Type |
|
| 02_26_2003 NOTICE OF DECISIONS.PDF |
SPECIAL APPLICATIONS |
VIEW
|
| SITE PLAN EXHIBITS.TIF |
SPECIAL APPLICATIONS |
VIEW
|
| BA SITE.TIF |
SPECIAL APPLICATIONS |
VIEW
|