Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138211990
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/19/2026 7:18 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Special Development Requests & Requirements

Date - 11/19/2026 7:18 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
T05SA00399 Efectuat 01/20/2007 C10-06-02 CHANEZ RESIDENCE ADDITIONS (T05CM05526) The applicant proposes to construct room additions and a new carport and porch. The applicants are requesting the following variances: 1) Reduce the setback of the proposed carport from the front street lot line; 2) Reduce the setback of the proposed carport from the side lot line; 3) Reduce the length of the driveway, as measured from the front street lot line; 4) Reduce the setback of the living room and bedroom additions from the front lot line; and, 5) Reduce the setback of the bedroom additions from the south property line. DECISION: Variances 1, 2, 3, 4, and 5: GRANTED SUBJECT TO THE FOLLOWING CONDITIONS: A. Carport not to be enclosed except as shown for firewall. B. No parking in the area between the front of the carport and front street lot line.

Permits

Parcel Number - 138211990
Date - 11/19/2026 7:18 a.m.
Total Number Of Permits - (39)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
T05CM05526 Final 11/01/2005 07/10/2007 COMBO ADDITION:MASTER BEDROOM:LIVING ROOM

Code Enforcement

Parcel Number - 138211990
Date - 11/19/2026 7:18 a.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
T12DV06373 Complian 07/31/2012 N/A DNR_VIOL Overgrown grass/weeds on property and right of way curb areas.
T13DV01265 Complian 03/04/2013 N/A DNR_VIOL Graffiti on gate on Elvira Road.