Parcel Search: 138210050
Parcel Search
Parcel Attributes
| Parcel | 138210050 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/21/2026 9:47 p.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 138210050
Date - 11/21/2026 9:47 p.m.
Total Number Of Permits - (43)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0126-00042 | Complete | 01/07/2026 | 07/18/2026 | Right-of-Way (ROW) - Utility | WOs T157910 & T157912. TEP to work in and near road ROW to: Replace 15 - pad mounted transformers and 2 – 2.5” primary risers; Swing 2 – 2.5” 1Ø primary riser; Replace hardware at 4 utility poles; Replace Approx. 3,500’ underground primary cable; Replace 4 poles; Remove 1 pole w/span guy and anchor; Replace 4 OH XFMRS; Remove 1 - conversion bank; Remove 1 - GOAB switch; Remove approx. 250' OH conductor; Install approx. 60' of new OH conductor. 04/10/2026 - Request for 90 Day Renewal as of 04/19/2026 | |
| TR-UTL-0626-01054 | Fees due | 06/25/2026 | N/A | Right-of-Way (ROW) - Utility | Bore 2563' and Trench 253' to place conduit and fiber cable. Place 575' of aerial fiber cable Place 33 pedestals | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| T03PL00669 | Final | 04/09/2003 | 02/19/2006 | PLUMB | REPAIR:PLUMBING | |
| T19CM06179 | Final | 08/27/2019 | 03/03/2020 | COMBO | 200 AMPS ELECTRICAL SERVICE UPGRADE | |
| T19CM09246 | Final | 12/17/2019 | 07/05/2020 | COMBO | REPAIR/REPL GAS LINE |
Code Enforcement
Parcel Number - 138210050
Date - 11/21/2026 9:47 p.m.
Total Number Of Code Cases - 1
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T09DV05864 | Noverify | 10/09/2009 | N/A | DNR_VIOL | Overgrown weeds and trash |